IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

570

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0639 # 03 Y:2010 03 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,040 $13,990 Not Implemented
CO0639 # 02 Y:2010 02 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,600 $10,320 Not Implemented
CO0639 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,180 $340 Implemented
CO0598 # 06 Y:2007 06 2007 USE SOLAR HEAT TO MAKE ELECTRICTY $1,310 $11,000 Not Implemented
CO0598 # 05 Y:2007 05 2007 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,660 $4,250 Not Implemented
CO0598 # 04 Y:2007 04 2007 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,960 $14,520 Not Implemented
CO0598 # 03 Y:2007 03 2007 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $15,090 $338,400 Not Implemented
CO0598 # 02 Y:2007 02 2007 IMPROVE COMBUSTION CONTROL CAPABILITY $37,380 $112,000 Not Implemented
CO0598 # 01 Y:2007 01 2007 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $77,320 $140,620 Not Implemented
CO0583 # 09 Y:2006 09 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $1,450 $18,370 Not Implemented
CO0583 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,800 $2,380 Implemented
CO0583 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,400 $9,510 Implemented
CO0583 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,970 $37,470 Not Implemented
CO0583 # 05 Y:2006 05 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $480 $165 Implemented
CO0583 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,990 $200 Implemented
CO0583 # 03 Y:2006 03 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $5,120 $4,920 Implemented
CO0583 # 02 Y:2006 02 2006 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING $31,500 $1,420 Implemented
CO0583 # 01 Y:2006 01 2006 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $213,730 $703,800 Not Implemented
CO0547 # 07 Y:2004 07 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,320 $27,720 Not Implemented
CO0547 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $4,630 $1,790 Not Implemented
CO0547 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,590 $4,680 Implemented
CO0547 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,360 $570 Implemented
CO0547 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $880 $240 Implemented
CO0547 # 06 Y:2004 06 2004 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $300 $420 Implemented
CO0547 # 04 Y:2004 04 2004 COVER OPEN TANKS $1,200 $750 Implemented