Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
108
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0249 # 01 Y:2000 | 01 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,706 | $127 | Not Implemented |
IA0249 # 02 Y:2000 | 02 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,482 | $25 | Not Implemented |
IA0249 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $854 | $38 | Implemented |
IA0249 # 04 Y:2000 | 04 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,223 | $0 | Implemented |
IA0249 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,737 | $5,177 | Not Implemented |
IA0249 # 06 Y:2000 | 06 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,039 | $2,715 | Not Implemented |
IA0249 # 07 Y:2000 | 07 | 2000 | INSTALL OCCUPANCY SENSORS | $609 | $665 | Not Implemented |
IA0249 # 08 Y:2000 | 08 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $652 | $0 | Not Implemented |
IA0249 # 09 Y:2000 | 09 | 2000 | CLEAR AND RENT EXISTING SPACE | $465,000 | $350,000 | Not Implemented |
IA0249 # 10 Y:2000 | 10 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $186,600 | $90,000 | Not Implemented |
KU0511 # 01 Y:1998 | 01 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $25,680 | $19,610 | Implemented |
KU0511 # 02 Y:1998 | 02 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $8,600 | $32,720 | Not Implemented |
KU0511 # 03 Y:1998 | 03 | 1998 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $3,080 | $3,040 | Implemented |
KU0511 # 04 Y:1998 | 04 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,570 | $2,550 | Implemented |
KU0511 # 05 Y:1998 | 05 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,560 | $800 | Implemented |
KU0511 # 06 Y:1998 | 06 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,670 | $3,960 | Implemented |
KU0511 # 07 Y:1998 | 07 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $590 | $360 | Implemented |
KU0511 # 08 Y:1998 | 08 | 1998 | INSULATE BARE EQUIPMENT | $230 | $680 | Implemented |
KU0511 # 09 Y:1998 | 09 | 1998 | MODIFY STARTUP/SHUTDOWN TIMES | $75,530 | $0 | Not Implemented |
KU0511 # 10 Y:1998 | 10 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $15,070 | $17,000 | Implemented |
KU0511 # 11 Y:1998 | 11 | 1998 | AUTOMATE FINISHING PROCESS | $12,150 | $42,810 | Not Implemented |
KU0511 # 12 Y:1998 | 12 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $5,560 | $690 | Implemented |
KU0511 # 13 Y:1998 | 13 | 1998 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $4,980 | $10,000 | Implemented |
KU0511 # 14 Y:1998 | 14 | 1998 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $4,120 | $4,400 | Not Implemented |
KU0511 # 15 Y:1998 | 15 | 1998 | PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW | $1,300 | $800 | Not Implemented |