IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

566

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0276 # 01 Y:2022 01 2022 ADOPT IN-HOUSE MATERIAL GENERATION $42,153 $40,000 Not Implemented
TT0269 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,648 $2,500 Not Implemented
TT0269 # 01 Y:2022 01 2022 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $24,682 $2,000 Not Implemented
TT0269 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,069 $25,000 Not Implemented
TT0269 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $6,223 $27,500 Not Implemented
TT0269 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,847 $3,500 Not Implemented
TT0269 # 06 Y:2022 06 2022 RECOVER WASTE HEAT FROM EQUIPMENT $1,911 $11,000 Not Implemented
TT0274 # 01 Y:2022 01 2022 INSTALL TIMERS AND/OR THERMOSTATS $5,185 $9,150 Not Implemented
TT0274 # 03 Y:2022 03 2022 DEVELOP A REPAIR/REPLACE POLICY $2,258 $2,000 Not Implemented
TT0274 # 02 Y:2022 02 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,579 $18,000 Implemented
TT0274 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,530 $0 Implemented
TT0274 # 05 Y:2022 05 2022 UPGRADE CONTROLS ON COMPRESSORS $1,507 $2,040 Not Implemented
TT0274 # 06 Y:2022 06 2022 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $1,438 $1,240 Not Implemented
TT0274 # 07 Y:2022 07 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,129 $1,700 Not Implemented
TT0266 # 05 Y:2022 05 2022 INSTALL TIMERS AND/OR THERMOSTATS $2,049 $1,100 Implemented
TT0266 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,458 $6,147 Implemented
TT0266 # 03 Y:2022 03 2022 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $4,496 $2,400 Implemented
TT0266 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $11,120 $138,300 Not Implemented
TT0266 # 01 Y:2022 01 2022 LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD $32,000 $3,900 Implemented
TT0234 # 01 Y:2020 01 2020 INSTALL TIMERS AND/OR THERMOSTATS $18,933 $450 Not Implemented
TT0234 # 02 Y:2020 02 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,187 $15,000 Not Implemented
TT0234 # 03 Y:2020 03 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,742 $3,800 Not Implemented
TT0234 # 05 Y:2020 05 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,041 $3,675 Not Implemented
TT0234 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,207 $3,000 Not Implemented
TT0200 # 06 Y:2017 06 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,216 $7,500 Not Implemented