IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

276

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LT0008 # 02 Y:1984 02 1984 COVER OPEN TANKS $134 $204 Not Implemented
LT0008 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $380 $300 Implemented
KU0143 # 13 Y:1984 13 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $183 $0 Implemented
KU0143 # 12 Y:1984 12 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $454 $300 Not Implemented
KU0143 # 11 Y:1984 11 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $548 $0 Not Implemented
KU0143 # 10 Y:1984 10 1984 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $620 $920 Implemented
KU0143 # 09 Y:1984 09 1984 INSULATE BARE EQUIPMENT $663 $1,200 Not Implemented
KU0143 # 08 Y:1984 08 1984 INSULATE BARE EQUIPMENT $755 $500 Not Implemented
GT0235 # 01 Y:1984 01 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,170 $250 Implemented
GT0235 # 02 Y:1984 02 1984 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $136 $473 Implemented
GT0235 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $840 $1,100 Implemented
KU0143 # 07 Y:1984 07 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,043 $1,200 Not Implemented
KU0143 # 06 Y:1984 06 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,229 $650 Not Implemented
KU0143 # 05 Y:1984 05 1984 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $4,141 $2,000 Implemented
TS0007 # 05 Y:1984 05 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $4,243 $0 Implemented
TS0007 # 02 Y:1984 02 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $13,248 $25,350 Not Implemented
KU0143 # 04 Y:1984 04 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,586 $3,000 Implemented
ST0004 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,185 $200 Implemented
ST0004 # 03 Y:1984 03 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,058 $40 Implemented
ST0004 # 04 Y:1984 04 1984 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $583 $1,480 Implemented
ST0004 # 05 Y:1984 05 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $990 $960 Implemented
ST0004 # 06 Y:1984 06 1984 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $4,135 $845 Implemented
TN0225 # 01 Y:1984 01 1984 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,090 $13,000 Not Implemented
TS0007 # 01 Y:1984 01 1984 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $12,640 $34,000 Not Implemented
TN0225 # 07 Y:1984 07 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,159 $3,500 Not Implemented