Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,450
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LM0030 # 08 Y:2002 | 08 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $86,071 | $175,000 | Not Implemented |
LM0030 # 09 Y:2002 | 09 | 2002 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $600,000 | $3,100 | Not Implemented |
LM0030 # 10 Y:2002 | 10 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $220,500 | $700,000 | Not Implemented |
LM0030 # 11 Y:2002 | 11 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $2,080 | $224 | Not Implemented |
LM0029 # 01 Y:2002 | 01 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $592 | $735 | Implemented |
LM0029 # 02 Y:2002 | 02 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,200 | $0 | Implemented |
LM0029 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,118 | $500 | Implemented |
LM0029 # 04 Y:2002 | 04 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,628 | $700 | Implemented |
LM0029 # 05 Y:2002 | 05 | 2002 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $200,000 | $163,000 | Not Implemented |
LM0029 # 06 Y:2002 | 06 | 2002 | DEVELOP STANDARD OPERATING PROCEDURES | $40,500 | $7,960 | Not Implemented |
LM0029 # 07 Y:2002 | 07 | 2002 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $45,000 | $16,500 | Not Implemented |
LM0029 # 08 Y:2002 | 08 | 2002 | MODIFY WORKLOAD | $247,361 | $15,000 | Not Implemented |
LM0029 # 09 Y:2002 | 09 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $165,000 | $350,000 | Not Implemented |
LM0029 # 10 Y:2002 | 10 | 2002 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $7,500 | $1,000 | Implemented |
LM0029 # 11 Y:2002 | 11 | 2002 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $7,500 | $1,000 | Implemented |
LM0023 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,237 | $500 | Implemented |
LM0023 # 02 Y:2002 | 02 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,782 | $2,200 | Not Implemented |
LM0023 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,630 | $5,105 | Not Implemented |
LM0023 # 04 Y:2002 | 04 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,621 | $2,611 | Not Implemented |
LM0023 # 05 Y:2002 | 05 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,241 | $650 | Not Implemented |
LM0023 # 06 Y:2002 | 06 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $17,080 | $3,200 | Implemented |
LM0023 # 07 Y:2002 | 07 | 2002 | SCHEDULE DELIVERIES ACCORDING TO DEMAND | $80,000 | $21,770 | Implemented |
LM0023 # 08 Y:2002 | 08 | 2002 | INSTALL AUTOMATIC PACKING EQUIPMENT | $3,330 | $5,000 | Implemented |
LM0023 # 09 Y:2002 | 09 | 2002 | HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME | $47,000 | $2,000 | Not Implemented |
LM0023 # 10 Y:2002 | 10 | 2002 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $34,667 | $7,348 | Implemented |