Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,620
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0714 # 08 Y:2005 | 08 | 2005 | USE MINIMUM SAFE OVEN VENTILATION | $1,972 | $150 | Implemented |
UD0714 # 09 Y:2005 | 09 | 2005 | MINIMIZE WATER USAGE | $1,311 | $1,200 | Implemented |
UD0714 # 10 Y:2005 | 10 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,296 | $0 | Implemented |
UD0714 # 11 Y:2005 | 11 | 2005 | MINIMIZE WATER USAGE | $1,138 | $350 | Implemented |
UD0714 # 12 Y:2005 | 12 | 2005 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $1,000 | $4,000 | Not Implemented |
UD0714 # 13 Y:2005 | 13 | 2005 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $928 | $200 | Not Implemented |
UD0714 # 14 Y:2005 | 14 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $884 | $330 | Not Implemented |
UD0714 # 15 Y:2005 | 15 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $884 | $0 | Implemented |
UD0714 # 16 Y:2005 | 16 | 2005 | INSULATE BARE EQUIPMENT | $361 | $650 | Not Implemented |
UM0274 # 01 Y:2005 | 01 | 2005 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $42,936 | $135,000 | Not Implemented |
UM0274 # 02 Y:2005 | 02 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,622 | $2,000 | Not Implemented |
UM0274 # 03 Y:2005 | 03 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,242 | $0 | Implemented |
UM0274 # 04 Y:2005 | 04 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,966 | $200 | Not Implemented |
UM0274 # 05 Y:2005 | 05 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,699 | $700 | Not Implemented |
UM0274 # 06 Y:2005 | 06 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $791 | $2,000 | Not Implemented |
WV0307 # 01 Y:2004 | 01 | 2004 | USE RADIANT HEATER FOR SPOT HEATING | $33,386 | $16,600 | Not Implemented |
WV0307 # 02 Y:2004 | 02 | 2004 | MINIMIZE WATER USAGE | $9,168 | $7,800 | Not Implemented |
WV0307 # 03 Y:2004 | 03 | 2004 | ISOLATE HOT OR COLD EQUIPMENT | $3,113 | $755 | Implemented |
WV0307 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,891 | $4,040 | Not Implemented |
WV0307 # 05 Y:2004 | 05 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,255 | $1,505 | Not Implemented |
WV0307 # 06 Y:2004 | 06 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,120 | $600 | Not Implemented |
WV0307 # 07 Y:2004 | 07 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,956 | $1,260 | Not Implemented |
WV0307 # 08 Y:2004 | 08 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,767 | $53 | Implemented |
WV0307 # 09 Y:2004 | 09 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,177 | $210 | Implemented |
WV0307 # 10 Y:2004 | 10 | 2004 | DEVELOP A REPAIR/REPLACE POLICY | $1,513 | $271 | Implemented |