IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,620

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0307 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $903 $0 Implemented
WV0307 # 12 Y:2004 12 2004 USE OPTIMUM THICKNESS INSULATION $278 $380 Implemented
WV0307 # 13 Y:2004 13 2004 INSULATE BARE EQUIPMENT $262 $260 Implemented
WV0307 # 14 Y:2004 14 2004 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,224 $140 Implemented
WV0307 # 15 Y:2004 15 2004 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $75 $0 Not Implemented
WV0302 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,584 $3,731 Implemented
WV0302 # 02 Y:2004 02 2004 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,141 $0 Implemented
WV0302 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,134 $292 Implemented
WV0302 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,072 $7,735 Implemented
WV0302 # 05 Y:2004 05 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,067 $7,050 Not Implemented
WV0302 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,066 $2,200 Implemented
WV0302 # 07 Y:2004 07 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,889 $80 Implemented
WV0302 # 08 Y:2004 08 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,260 $50 Implemented
WV0302 # 09 Y:2004 09 2004 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,096 $1,967 Not Implemented
WV0302 # 10 Y:2004 10 2004 INSTALL OCCUPANCY SENSORS $921 $1,400 Implemented
WV0302 # 11 Y:2004 11 2004 DEVELOP A REPAIR/REPLACE POLICY $731 $300 Implemented
WV0302 # 12 Y:2004 12 2004 CONTRACT A WOOD PALLET RECYCLING COMPANY $28,080 $100 Implemented
WV0302 # 13 Y:2004 13 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,450 $5,000 Implemented
WV0298 # 01 Y:2004 01 2004 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $3,459 $2,100 Not Implemented
WV0298 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,929 $440 Implemented
WV0298 # 03 Y:2004 03 2004 DEVELOP A REPAIR/REPLACE POLICY $2,864 $1,928 Not Implemented
WV0298 # 04 Y:2004 04 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,447 $220 Implemented
WV0298 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $2,066 $1,286 Not Implemented
WV0298 # 06 Y:2004 06 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,986 $0 Not Implemented
WV0298 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,877 $240 Implemented