IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,775

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0114 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,234 $60 Implemented
TA0114 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $684 $0 Not Implemented
TA0114 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $117 $270 Implemented
WI0512 # 01 Y:2006 01 2006 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $554 $21,500 Not Implemented
WI0512 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,679 $72,610 Implemented
WI0512 # 03 Y:2006 03 2006 USE EVAPORATION TO CONCENTRATE MATERIAL $24,691 $12,000 Not Implemented
WI0512 # 04 Y:2006 04 2006 AUTOMATE PAYROLL SYSTEM $5,350 $0 Implemented
WI0512 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,371 $3,200 Not Implemented
WI0512 # 06 Y:2006 06 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $843 $700 Implemented
WI0512 # 07 Y:2006 07 2006 INSTALL OCCUPANCY SENSORS $258 $150 Implemented
TA0113 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $55,045 $24,738 Implemented
TA0113 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $540 $370 Not Implemented
TA0113 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $12,153 $1,123 Not Implemented
TA0113 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $232 $340 Not Implemented
TA0113 # 05 Y:2006 05 2006 OPTIMIZE PLANT POWER FACTOR $12,697 $25,000 Implemented
UM0298 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,759 $1,050 Not Implemented
UM0298 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,355 $1,863 Not Implemented
UM0298 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $799 $1,040 Not Implemented
UM0298 # 04 Y:2006 04 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $243 $200 Not Implemented
UM0298 # 05 Y:2006 05 2006 INSTALL OCCUPANCY SENSORS $126 $92 Not Implemented
OK0723 # 01 Y:2006 01 2006 OPERATE BOILERS ON HIGH FIRE SETTING $23,600 $18,000 Implemented
OK0723 # 02 Y:2006 02 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $7,849 $10,033 Not Implemented
OK0723 # 03 Y:2006 03 2006 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,135 $587 Implemented
OK0723 # 04 Y:2006 04 2006 REPAIR OR REPLACE STEAM TRAPS $1,065 $2,539 Not Implemented
OK0723 # 05 Y:2006 05 2006 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,531 $5,250 Implemented