IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

935

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0195 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,025 $750 Implemented
ND0195 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,596 $242 Implemented
ND0195 # 04 Y:1994 04 1994 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,963 $12,476 Implemented
ND0195 # 05 Y:1994 05 1994 INSTALL OCCUPANCY SENSORS $8,212 $900 Not Implemented
ND0195 # 06 Y:1994 06 1994 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS $6,250 $1,500 Implemented
ND0195 # 07 Y:1994 07 1994 DIRECT WARMEST AIR TO COMBUSTION INTAKE $5,153 $1,000 Not Implemented
ND0195 # 08 Y:1994 08 1994 INSULATE BARE EQUIPMENT $40 $98 Implemented
UM0009 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,936 $6,420 Implemented
UM0009 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,061 $18,721 Implemented
UM0009 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $262 $800 Implemented
UM0009 # 04 Y:1994 04 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,513 $1,500 Not Implemented
UM0009 # 05 Y:1994 05 1994 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $88,700 $330,000 Not Implemented
UM0009 # 06 Y:1994 06 1994 COVER OPEN TANKS $4,163 $2,440 Implemented
UM0009 # 07 Y:1994 07 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $760 $932 Not Implemented
UM0009 # 08 Y:1994 08 1994 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,325 $6,000 Not Implemented
UM0009 # 09 Y:1994 09 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $930 $196 Implemented
UM0009 # 10 Y:1994 10 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,829 $1,500 Implemented
UM0009 # 11 Y:1994 11 1994 USE RADIANT HEATER FOR SPOT HEATING $8,161 $21,400 Implemented
UM0003 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $28,560 $49,340 Implemented
UM0003 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,804 $0 Not Implemented
UM0003 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $470 $400 Implemented
UM0003 # 04 Y:1994 04 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,462 $2,000 Not Implemented
UM0003 # 05 Y:1994 05 1994 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $52,311 $39,200 Not Implemented
UM0001 # 09 Y:1994 09 1994 REDUCE VENTILATION AIR $21,861 $25,000 Implemented
UM0001 # 10 Y:1994 10 1994 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $4,786 $1,700 Implemented