IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,750

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0173 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,742 $600 Implemented
BD0173 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,471 $1,000 Not Implemented
BD0173 # 04 Y:2000 04 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,576 $10,000 Not Implemented
BD0173 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $1,220 $1,050 Not Implemented
BD0173 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $805 $660 Not Implemented
BD0173 # 07 Y:2000 07 2000 RECOVER WASTE HEAT FROM EQUIPMENT $664 $750 Not Implemented
BD0173 # 08 Y:2000 08 2000 MINIMIZE WATER USAGE $2,833 $3,300 Not Implemented
BD0173 # 09 Y:2000 09 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,980 $500 Not Implemented
BD0173 # 10 Y:2000 10 2000 CLEAR AND RENT EXISTING SPACE $382,956 $150,000 Implemented
WI0381 # 01 Y:2000 01 2000 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $10,973 $29,550 Not Implemented
WI0381 # 02 Y:2000 02 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,183 $4,000 Implemented
WI0381 # 03 Y:2000 03 2000 INSTALL TIMERS AND/OR THERMOSTATS $3,541 $0 Implemented
WI0381 # 04 Y:2000 04 2000 INSTALL AUTOMATIC STACK DAMPER $1,157 $1,000 Implemented
WI0381 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,869 $8,223 Not Implemented
WI0381 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $242 $300 Not Implemented
WI0381 # 07 Y:2000 07 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,293 $840 Not Implemented
WI0381 # 08 Y:2000 08 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,028 $1,300 Implemented
WI0381 # 09 Y:2000 09 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $945 $0 Not Implemented
WI0381 # 10 Y:2000 10 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $417 $687 Not Implemented
WI0381 # 11 Y:2000 11 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $184 $0 Not Implemented
WI0381 # 12 Y:2000 12 2000 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $124 $300 Implemented
WI0379 # 01 Y:2000 01 2000 INSTALL SENSORS TO DETECT DEFECTS $36,000 $35,000 Not Implemented
WI0379 # 02 Y:2000 02 2000 DISTILL CONTAMINATED SOLVENTS FOR REUSE $20,843 $14,000 Not Implemented
WI0379 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,891 $11,765 Not Implemented
WI0379 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,151 $740 Not Implemented