IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

394

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS1916 # 06 Y:2019 06 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $129 $104 Not Implemented
LS1916 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,588 $810 Not Implemented
LS1916 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $105 $50 Not Implemented
LS1916 # 03 Y:2019 03 2019 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $394 $38 Not Implemented
LS1916 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $569 $50 Not Implemented
LS1916 # 01 Y:2019 01 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,663 $250 Not Implemented
UA0217 # 07 Y:2019 07 2019 RECOVER WASTE HEAT FROM EQUIPMENT $3,995 $3,320 Not Implemented
UA0217 # 06 Y:2019 06 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,941 $50 Implemented
UA0217 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $856 $922 Not Implemented
UA0217 # 04 Y:2019 04 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $36,500 $104,362 Not Implemented
UA0217 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,910 $1,395 Implemented
UA0217 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,933 $50 Not Implemented
UA0217 # 01 Y:2019 01 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,041 $3,585 Not Implemented
AM0789 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $15,300 $53,500 Implemented
AM0789 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,740 $46,480 Implemented
AM0789 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,900 $1,620 Implemented
AM0789 # 05 Y:2019 05 2019 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,600 $0 Implemented
AM0789 # 04 Y:2019 04 2019 INSTALL SKYLIGHTS $4,290 $7,120 Not Implemented
AM0789 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,100 $2,000 Implemented
AM0788 # 06 Y:2019 06 2019 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $860 $124 Implemented
AM0788 # 05 Y:2019 05 2019 PAY UTILITY BILLS ON TIME $1,270 $0 Implemented
AM0788 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,125 $4,520 Implemented
AM0788 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,200 $17,300 Implemented
AM0788 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,355 $1,000 Implemented
AM0788 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $10,300 $28,750 Not Implemented