Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,750
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0368 # 12 Y:2000 | 12 | 2000 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,257 | $500 | Implemented |
WI0368 # 13 Y:2000 | 13 | 2000 | USE OPTIMUM THICKNESS INSULATION | $470 | $702 | Not Implemented |
WI0364 # 01 Y:2000 | 01 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $20,162 | $0 | Implemented |
WI0364 # 02 Y:2000 | 02 | 2000 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $7,614 | $15,000 | Not Implemented |
WI0364 # 03 Y:2000 | 03 | 2000 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $6,918 | $20,750 | Not Implemented |
WI0364 # 04 Y:2000 | 04 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,730 | $740 | Not Implemented |
WI0364 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $489 | $90 | Not Implemented |
WI0364 # 06 Y:2000 | 06 | 2000 | INSULATE BARE EQUIPMENT | $1,567 | $3,871 | Not Implemented |
WI0364 # 07 Y:2000 | 07 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $594 | $438 | Not Implemented |
BD0153 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,555 | $13,420 | Implemented |
BD0153 # 02 Y:2000 | 02 | 2000 | INSTALL OCCUPANCY SENSORS | $3,918 | $930 | Implemented |
BD0153 # 03 Y:2000 | 03 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,648 | $1,125 | Implemented |
BD0153 # 04 Y:2000 | 04 | 2000 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $826 | $0 | Implemented |
BD0153 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $245 | $235 | Not Implemented |
BD0153 # 06 Y:2000 | 06 | 2000 | USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE | $1,494 | $4,825 | Not Implemented |
BD0153 # 07 Y:2000 | 07 | 2000 | MODIFY MATERIAL APPLICATION METHODS | $1,171 | $1,500 | Implemented |
BD0153 # 08 Y:2000 | 08 | 2000 | AUTOMATE PAYROLL SYSTEM | $7,644 | $7,000 | Not Implemented |
BD0148 # 01 Y:1999 | 01 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,397 | $3,000 | n/a |
BD0148 # 02 Y:1999 | 02 | 1999 | USE POWER DURING OFF-PEAK PERIODS | $9,788 | $1,000 | n/a |
BD0148 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,112 | $0 | n/a |
BD0148 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,057 | $800 | n/a |
BD0148 # 05 Y:1999 | 05 | 1999 | INSTALL OCCUPANCY SENSORS | $945 | $1,350 | n/a |
BD0148 # 06 Y:1999 | 06 | 1999 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $653 | $644 | n/a |
BD0148 # 07 Y:1999 | 07 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $428 | $1,350 | n/a |
BD0148 # 08 Y:1999 | 08 | 1999 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $22,175 | $25,000 | n/a |