IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,620

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0222 # 01 Y:2002 01 2002 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $28,900 $10,000 Implemented
UM0222 # 02 Y:2002 02 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $23,074 $1,750 Implemented
UM0222 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,900 $1,275 Implemented
UM0222 # 04 Y:2002 04 2002 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,523 $2,000 Not Implemented
UM0222 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,261 $4,000 Not Implemented
UD0649 # 01 Y:2002 01 2002 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $72,080 $3,600 Not Implemented
UD0649 # 02 Y:2002 02 2002 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME $16,650 $15,000 Not Implemented
UD0649 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $2,835 $3,500 Not Implemented
UD0649 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,660 $6,691 Implemented
UD0649 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,306 $6,000 Implemented
UD0649 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,082 $1,008 Not Implemented
UD0649 # 07 Y:2002 07 2002 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $1,615 $1,275 Not Implemented
UD0649 # 08 Y:2002 08 2002 INSTALL OCCUPANCY SENSORS $512 $113 Not Implemented
UD0649 # 09 Y:2002 09 2002 INSULATE BARE EQUIPMENT $502 $1,640 Not Implemented
UD0649 # 10 Y:2002 10 2002 MINIMIZE WATER USAGE $373 $0 Implemented
UD0649 # 11 Y:2002 11 2002 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $92 $0 Implemented
WV0239 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,858 $13,440 Implemented
WV0239 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,082 $500 Implemented
WV0239 # 03 Y:2002 03 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,589 $4,390 Not Implemented
WV0239 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $10,526 $1,582 Not Implemented
WV0239 # 05 Y:2002 05 2002 USE OPTIMUM THICKNESS INSULATION $3,072 $1,080 Implemented
WV0239 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,529 $0 Implemented
WV0239 # 07 Y:2002 07 2002 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,408 $1,044 Implemented
WV0239 # 08 Y:2002 08 2002 RECOVER WASTE HEAT FROM EQUIPMENT $5,932 $5,580 Not Implemented
WV0239 # 09 Y:2002 09 2002 RECOVER WASTE HEAT FROM EQUIPMENT $18,443 $140 Implemented