IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,436

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0180 # 15 Y:1999 15 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $162,500 $85,000 Not Implemented
SD0229 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,875 $2,988 Implemented
SD0229 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,528 $10,000 Not Implemented
SD0229 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,665 $500 Implemented
SD0229 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,377 $120 Implemented
SD0229 # 05 Y:1999 05 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,502 $11,000 Not Implemented
SD0229 # 06 Y:1999 06 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,372 $540 Not Implemented
SD0229 # 07 Y:1999 07 1999 INSTALL BACK-UP EQUIPMENT $23,040 $15,000 Not Implemented
SD0229 # 08 Y:1999 08 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $76,320 $30,000 Not Implemented
SD0230 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,090 $4,048 Implemented
SD0230 # 02 Y:1999 02 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $2,483 $6,030 Not Implemented
SD0230 # 03 Y:1999 03 1999 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $257,414 $480,000 Not Implemented
SD0230 # 04 Y:1999 04 1999 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $1,099,432 $1,975,633 Not Implemented
SD0230 # 05 Y:1999 05 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $83,680 $0 Implemented
SD0230 # 06 Y:1999 06 1999 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $39,860 $16,000 Not Implemented
SD0230 # 07 Y:1999 07 1999 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $27,200 $0 Implemented
SD0230 # 08 Y:1999 08 1999 PURCHASE EQUIPMENT INSTEAD OF LEASING $0 $2,410 Implemented
SD0233 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $331 $725 Implemented
SD0233 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,292 $360 Implemented
SD0233 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $940 $584 Implemented
SD0233 # 04 Y:1999 04 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,392 $1,394 Implemented
SD0233 # 05 Y:1999 05 1999 MAINTAIN MACHINES TO REDUCE LEAKS $6,160 $0 Implemented
SD0233 # 06 Y:1999 06 1999 AUTOMATE FINISHING PROCESS $67,000 $9,000 Not Implemented
SD0220 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,040 $5,528 Implemented
SD0220 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,440 $500 Implemented