IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0070 # 01 Y:2022 01 2022 USE RADIANT HEATER FOR SPOT HEATING $41,224 $20,136 Not Implemented
NL0070 # 02 Y:2022 02 2022 UPGRADE CONTROLS ON COMPRESSORS $32,832 $16,500 Implemented
NL0070 # 03 Y:2022 03 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $26,148 $35 Implemented
NL0070 # 04 Y:2022 04 2022 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $6,619 $1,180 Not Implemented
NL0070 # 05 Y:2022 05 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,030 $4,945 Not Implemented
NL0070 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,590 $23,500 Implemented
NL0070 # 07 Y:2022 07 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $675 $3,315 Implemented
NL0070 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $490 $854 Implemented
TT0277 # 01 Y:2022 01 2022 INSULATE BARE EQUIPMENT $15,235 $8,435 Not Implemented
TT0277 # 02 Y:2022 02 2022 ADOPT IN-HOUSE MATERIAL GENERATION $11,462 $31,920 Not Implemented
TT0277 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,904 $3,000 Not Implemented
TT0277 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,769 $2,815 Not Implemented
TT0277 # 05 Y:2022 05 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,371 $4,045 Not Implemented
TT0277 # 06 Y:2022 06 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,278 $500 Not Implemented
TT0277 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,116 $2,790 Not Implemented
TT0277 # 08 Y:2022 08 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $812 $1,090 Not Implemented
LT8362 # 01 Y:2022 01 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $673 $0 n/a
LT8362 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,493 $30,000 n/a
LT8362 # 03 Y:2022 03 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,079 $0 n/a
LT8362 # 04 Y:2022 04 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $808 $29,000 n/a
LT8362 # 05 Y:2022 05 2022 UPGRADE CONTROLS ON COMPRESSORS $10,089 $0 n/a
LT8362 # 06 Y:2022 06 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,938 $0 n/a
LT8362 # 07 Y:2022 07 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $223 $180 n/a
AM0852 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $49,000 $68,400 Implemented
AM0852 # 02 Y:2022 02 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,040 $1,835 Implemented