IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,139

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DS0157 # 02 Y:2000 02 2000 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,432 $800 Not Implemented
DS0157 # 03 Y:2000 03 2000 PAY BILLS ON TIME TO AVOID LATE FEES $1,297 $0 Not Implemented
CO0457 # 01 Y:2000 01 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,380 $7,500 Implemented
CO0457 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $1,340 $2,850 Not Implemented
CO0457 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $660 $0 Implemented
CO0457 # 04 Y:2000 04 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $660 $1,000 Implemented
CO0457 # 05 Y:2000 05 2000 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $1,880 $0 Not Implemented
CO0457 # 06 Y:2000 06 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $320 $0 Implemented
CO0457 # 07 Y:2000 07 2000 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $5,100 $1,510 Implemented
OK0590 # 01 Y:2000 01 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $17,680 $250 Not Implemented
OK0590 # 02 Y:2000 02 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $5,824 $3,443 Not Implemented
OK0590 # 03 Y:2000 03 2000 BURN WASTE OIL FOR HEAT $2,892 $3,490 Implemented
OK0590 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,604 $5,081 Not Implemented
OK0590 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $2,743 $1,613 Implemented
OK0590 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $761 $1,440 Not Implemented
ME0284 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,752 $16,593 Not Implemented
ME0284 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,586 $8,987 Implemented
ME0284 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,090 $15,253 Implemented
ME0284 # 04 Y:2000 04 2000 BURN A LESS EXPENSIVE GRADE OF FUEL $2,969 $250 Not Implemented
ME0284 # 05 Y:2000 05 2000 MINIMIZE WATER USAGE $992 $105 Not Implemented
AM0366 # 01 Y:2000 01 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,672 $7,000 Implemented
AM0366 # 02 Y:2000 02 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,600 $1,860 Not Implemented
AM0366 # 03 Y:2000 03 2000 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $3,740 $700 Not Implemented
AM0366 # 04 Y:2000 04 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,110 $150 Implemented
AM0366 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,515 $710 Implemented