IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,775

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0465 # 07 Y:2000 07 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $280 $0 Not Implemented
CO0465 # 08 Y:2000 08 2000 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME $6,930 $6,000 Not Implemented
CO0465 # 09 Y:2000 09 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,460 $250 Not Implemented
AS0278 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,451 $5,643 Not Implemented
AS0278 # 02 Y:2000 02 2000 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $260 $120 Not Implemented
AS0278 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,407 $120 Implemented
AS0278 # 04 Y:2000 04 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $666 $60 Implemented
AS0278 # 05 Y:2000 05 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $970 $60 Implemented
AR0193 # 01 Y:2000 01 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,366 $4,860 Not Implemented
AR0193 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,115 $30 Implemented
AR0193 # 03 Y:2000 03 2000 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $2,360 $3,000 Implemented
AR0193 # 04 Y:2000 04 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $553 $653 Implemented
AR0193 # 05 Y:2000 05 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $186 $0 Not Implemented
AR0193 # 06 Y:2000 06 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $21,302 $8,000 Implemented
AR0193 # 07 Y:2000 07 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $23,524 $1,000 Implemented
UL0242 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,646 $9,827 n/a
UL0242 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,135 $20 n/a
UL0242 # 03 Y:2000 03 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $19,623 $0 n/a
UL0242 # 04 Y:2000 04 2000 MODIFY CURRENT INCENTIVE PROGRAM $1,947 $60 n/a
ND0349 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,863 $9,787 Implemented
ND0349 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $681 $1,600 Implemented
ND0349 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $394 $420 Not Implemented
ND0349 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $917 $50 Implemented
ND0349 # 05 Y:2000 05 2000 USE PHOTOCELL CONTROLS $92 $300 Implemented
ND0349 # 06 Y:2000 06 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $302 $90 Implemented