IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,409

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0064 # 04 Y:1995 04 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,986 $3,171 Not Implemented
SF0064 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,491 $985 Implemented
SF0064 # 06 Y:1995 06 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $642 $2,508 Implemented
SF0064 # 07 Y:1995 07 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,033 $7,315 Implemented
SF0064 # 08 Y:1995 08 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $17,964 $3,807 Implemented
SF0064 # 09 Y:1995 09 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $913 $400 Implemented
SF0064 # 10 Y:1995 10 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $993 $0 Implemented
SF0064 # 11 Y:1995 11 1995 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $14,317 $6,540 Implemented
SF0064 # 12 Y:1995 12 1995 USE LESS WASTEFUL PACKAGING $2,885 $760 Not Implemented
SF0061 # 01 Y:1995 01 1995 INSTALL OCCUPANCY SENSORS $1,935 $360 Not Implemented
SF0061 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $129 $170 Implemented
SF0061 # 03 Y:1995 03 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $347 $1,570 Not Implemented
SF0061 # 04 Y:1995 04 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $1,658 $2,208 Implemented
SF0061 # 05 Y:1995 05 1995 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $733 $1,300 Not Implemented
SF0061 # 06 Y:1995 06 1995 COVER OPEN TANKS $3,373 $1,560 Not Implemented
SF0061 # 07 Y:1995 07 1995 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $6,048 $2,955 Not Implemented
SF0061 # 08 Y:1995 08 1995 USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE $2,880 $25,300 Not Implemented
SF0061 # 09 Y:1995 09 1995 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS $7,532 $1,288 Implemented
SF0061 # 10 Y:1995 10 1995 TREAT AND REUSE RINSE WATERS $10,340 $6,344 Not Implemented
SD0121 # 01 Y:1995 01 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,420 $7,500 Implemented
SD0121 # 02 Y:1995 02 1995 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $3,648 $977 Implemented
SD0121 # 03 Y:1995 03 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $656 $702 Implemented
SD0121 # 04 Y:1995 04 1995 REDUCE EXCESSIVE BOILER BLOWDOWN $664 $15 Implemented
SD0121 # 05 Y:1995 05 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,118 $1,583 Implemented
SD0121 # 06 Y:1995 06 1995 ADD AREA LIGHTING SWITCHES $1,489 $800 Not Implemented