IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,775

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0512 # 09 Y:1999 09 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $550 $770 Not Implemented
KU0512 # 10 Y:1999 10 1999 CONVERT TO ELECTROSTATIC POWDER COATING $278,220 $513,480 Not Implemented
KU0512 # 11 Y:1999 11 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $800,000 $29,240 Not Implemented
KU0512 # 12 Y:1999 12 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $220,990 $233,750 Not Implemented
OD0131 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $416 $900 Not Implemented
OD0131 # 02 Y:1999 02 1999 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $4,051 $3,290 Not Implemented
OD0131 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,972 $800 Not Implemented
OD0131 # 04 Y:1999 04 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $2,202 $0 Not Implemented
NV0124 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,858 $7,243 Implemented
NV0124 # 02 Y:1999 02 1999 INSULATE BARE EQUIPMENT $1,150 $800 Not Implemented
NV0124 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $292 $135 Not Implemented
NV0124 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,617 $8,520 Not Implemented
NV0124 # 05 Y:1999 05 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $308 $175 Not Implemented
NV0124 # 06 Y:1999 06 1999 UTILIZE OUTSIDE CONTRACTING $93,148 $0 Implemented
OK0567 # 01 Y:1999 01 1999 DISCONNECT BALLASTS $49 $429 Implemented
OK0567 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $657 $2,127 Not Implemented
OK0567 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $139 $171 Not Implemented
OK0567 # 04 Y:1999 04 1999 SCHEDULE DELIVERIES ACCORDING TO DEMAND $4,000 $0 Implemented
OK0567 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $382 $529 Implemented
OK0567 # 06 Y:1999 06 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $4,010 $15,000 Implemented
OK0567 # 07 Y:1999 07 1999 REDUCE SCRAP PRODUCTION $76,500 $40,000 Implemented
GT0658 # 01 Y:1999 01 1999 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $742 $0 Implemented
GT0658 # 02 Y:1999 02 1999 METER WASTE WATER $1,276 $500 Implemented
GT0658 # 03 Y:1999 03 1999 PAY UTILITY BILLS ON TIME $1,258 $0 Implemented
GT0658 # 04 Y:1999 04 1999 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,468 $200 Implemented