IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,567

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0147 # 06 Y:1998 06 1998 DISTILL CONTAMINATED SOLVENTS FOR REUSE $2,387 $0 Not Implemented
AR0147 # 07 Y:1998 07 1998 RECYCLE WHITE WATER $5,032 $0 Not Implemented
AR0147 # 08 Y:1998 08 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $26,479 $19,950 Not Implemented
UD0557 # 01 Y:1998 01 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $42,942 $12,000 Implemented
UD0557 # 02 Y:1998 02 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $60,203 $0 Implemented
UD0557 # 03 Y:1998 03 1998 RECYCLE CLEANING SOLVENT AND REUSE $9,078 $0 Not Implemented
UD0557 # 04 Y:1998 04 1998 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,643 $1,440 Not Implemented
UD0557 # 05 Y:1998 05 1998 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,636 $6,680 Not Implemented
UD0557 # 06 Y:1998 06 1998 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,778 $0 Not Implemented
NC0150 # 01 Y:1998 01 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $920 $400 Not Implemented
NC0150 # 02 Y:1998 02 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,383 $819 Not Implemented
NC0150 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $729 $1,532 Not Implemented
NC0150 # 04 Y:1998 04 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $244 $800 Implemented
NC0150 # 05 Y:1998 05 1998 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,244 $4,400 Implemented
NC0150 # 06 Y:1998 06 1998 USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS $14,434 $500 Not Implemented
NC0150 # 07 Y:1998 07 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $45,216 $16,000 Not Implemented
AS0233 # 01 Y:1998 01 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $508 $220 Not Implemented
AS0233 # 02 Y:1998 02 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $524 $60 Not Implemented
AS0233 # 03 Y:1998 03 1998 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $415 $365 Not Implemented
AS0233 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,226 $8,275 Not Implemented
AS0233 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $83 $87 Not Implemented
AS0233 # 06 Y:1998 06 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $368 $60 Not Implemented
AS0233 # 07 Y:1998 07 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $47,175 $480 Implemented
AS0233 # 08 Y:1998 08 1998 APPLY FOR INVESTMENT INCENTIVES $704 $60 Not Implemented
AS0233 # 09 Y:1998 09 1998 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $11,008 $1,480 Implemented