Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,585
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0315 # 02 Y:1998 | 02 | 1998 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $33,613 | $68,000 | Not Implemented |
WI0315 # 03 Y:1998 | 03 | 1998 | TREAT AND REUSE RINSE WATERS | $7,064 | $1,475 | Not Implemented |
WI0315 # 04 Y:1998 | 04 | 1998 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $4,722 | $14,000 | Not Implemented |
WI0315 # 05 Y:1998 | 05 | 1998 | COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES | $1,300 | $0 | Not Implemented |
WI0315 # 06 Y:1998 | 06 | 1998 | INSULATE BARE EQUIPMENT | $3,542 | $1,362 | Not Implemented |
WI0315 # 07 Y:1998 | 07 | 1998 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,180 | $0 | Not Implemented |
WI0315 # 08 Y:1998 | 08 | 1998 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,040 | $1,424 | Not Implemented |
WI0315 # 09 Y:1998 | 09 | 1998 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $931 | $0 | Not Implemented |
AS0219 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,150 | $2,888 | Implemented |
AS0219 # 02 Y:1998 | 02 | 1998 | USE SYNTHETIC LUBRICANT | $101 | $268 | Implemented |
AS0219 # 03 Y:1998 | 03 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,071 | $60 | Implemented |
AS0219 # 04 Y:1998 | 04 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,138 | $2,957 | Implemented |
AS0219 # 05 Y:1998 | 05 | 1998 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,425 | $1,500 | Implemented |
AS0219 # 06 Y:1998 | 06 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $36 | $30 | Implemented |
AS0219 # 07 Y:1998 | 07 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $72,920 | $15,300 | Not Implemented |
AS0219 # 08 Y:1998 | 08 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $5,983 | $10,352 | Not Implemented |
SD0190 # 01 Y:1998 | 01 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,869 | $11,580 | Implemented |
SD0190 # 02 Y:1998 | 02 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $30,174 | $15,667 | Not Implemented |
SD0190 # 03 Y:1998 | 03 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,878 | $116,225 | Not Implemented |
SD0190 # 04 Y:1998 | 04 | 1998 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $17,334 | $8,125 | Not Implemented |
SD0190 # 05 Y:1998 | 05 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,620 | $1,350 | Implemented |
SD0190 # 06 Y:1998 | 06 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,072 | $0 | Implemented |
SD0190 # 07 Y:1998 | 07 | 1998 | INSTALL TIMERS AND/OR THERMOSTATS | $788 | $300 | Not Implemented |
SD0190 # 08 Y:1998 | 08 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,086 | $4,856 | Not Implemented |
SD0190 # 09 Y:1998 | 09 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,443 | $6,942 | Implemented |