IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,133

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0086 # 06 Y:1997 06 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $859 $2,750 Not Implemented
BD0086 # 07 Y:1997 07 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $12,554 $14,000 Not Implemented
BD0086 # 08 Y:1997 08 1997 USE A RAG RECYCLE SERVICE $1,404 $0 Not Implemented
BD0086 # 09 Y:1997 09 1997 INSTALL EQUIPMENT TO MOVE PRODUCT $18,750 $4,000 Not Implemented
UM0087 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,900 $3,198 Not Implemented
UM0087 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,251 $28,450 Not Implemented
UM0087 # 03 Y:1997 03 1997 INSTALL OCCUPANCY SENSORS $1,692 $1,000 Not Implemented
UM0087 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,159 $450 Not Implemented
UM0087 # 05 Y:1997 05 1997 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $36,636 $22,800 Not Implemented
UM0087 # 06 Y:1997 06 1997 IMPROVE COMBUSTION CONTROL CAPABILITY $1,053 $3,460 Not Implemented
UM0087 # 07 Y:1997 07 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $5,708 $3,100 Not Implemented
UM0087 # 08 Y:1997 08 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $5,616 $0 Not Implemented
UM0087 # 09 Y:1997 09 1997 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $20,210 $0 Not Implemented
ND0274 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,097 $1,655 Implemented
ND0274 # 02 Y:1997 02 1997 OPTIMIZE PLANT POWER FACTOR $10,153 $15,462 Implemented
ND0274 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,526 $240 Implemented
ND0274 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,078 $1,500 Implemented
ND0274 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $460 $650 Implemented
ND0274 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $297 $144 Implemented
ND0274 # 07 Y:1997 07 1997 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $172 $449 Implemented
WV0118 # 01 Y:1997 01 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $535 $610 Implemented
WV0118 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,026 $200 Implemented
WV0118 # 03 Y:1997 03 1997 RECOVER WASTE HEAT FROM EQUIPMENT $368 $755 Not Implemented
WV0118 # 04 Y:1997 04 1997 INSULATE BARE EQUIPMENT $890 $1,440 Not Implemented
WV0118 # 05 Y:1997 05 1997 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,763 $10,400 Implemented