IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,620

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0387 # 06 Y:1992 06 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $891 $0 Not Implemented
UD0387 # 07 Y:1992 07 1992 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,594 $1,000 Implemented
UD0373 # 01 Y:1992 01 1992 OPTIMIZE PLANT POWER FACTOR $6,664 $8,600 Implemented
UD0373 # 02 Y:1992 02 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,724 $0 Implemented
UD0373 # 03 Y:1992 03 1992 RECOVER WASTE HEAT FROM EQUIPMENT $5,415 $3,000 Not Implemented
UD0373 # 04 Y:1992 04 1992 METER WASTE WATER $14,996 $300,000 Implemented
UD0373 # 05 Y:1992 05 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,143 $15,000 Not Implemented
UD0369 # 01 Y:1992 01 1992 OPTIMIZE PLANT POWER FACTOR $612 $1,600 Not Implemented
UD0369 # 02 Y:1992 02 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,020 $0 Implemented
UD0369 # 03 Y:1992 03 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,504 $0 Implemented
UD0369 # 04 Y:1992 04 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $850 $0 Implemented
UD0369 # 05 Y:1992 05 1992 RECOVER WASTE HEAT FROM EQUIPMENT $6,413 $300 Implemented
UD0369 # 06 Y:1992 06 1992 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $15,581 $25,000 Not Implemented
UD0369 # 07 Y:1992 07 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,842 $1,800 Implemented
UD0358 # 01 Y:1991 01 1991 USE DEMAND CONTROLLER OR LOAD SHEDDER $10,464 $7,000 Implemented
UD0358 # 02 Y:1991 02 1991 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $675 $0 Implemented
UD0358 # 03 Y:1991 03 1991 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $2,145 $200 Implemented
UD0358 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,170 $0 Implemented
UD0358 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,636 $0 Implemented
UD0358 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $959 $0 Implemented
UD0342 # 01 Y:1991 01 1991 OPTIMIZE PLANT POWER FACTOR $9,819 $0 Not Implemented
UD0342 # 02 Y:1991 02 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,238 $0 Not Implemented
UD0342 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,746 $0 Not Implemented
UD0342 # 04 Y:1991 04 1991 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $1,611 $2,000 Not Implemented
UD0342 # 05 Y:1991 05 1991 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,474 $11,865 Not Implemented