IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0546 # 02 Y:1994 02 1994 RECOVER WASTE HEAT FROM EQUIPMENT $2,580 $5,030 Not Implemented
GT0546 # 03 Y:1994 03 1994 ADJUST BURNERS FOR EFFICIENT OPERATION $3,540 $500 Not Implemented
GT0546 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $700 $4,140 Not Implemented
GT0546 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $290 $450 Not Implemented
AR0044 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,019 $565 Implemented
AR0044 # 02 Y:1994 02 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $588 $385 Implemented
AR0044 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $278 $100 Implemented
AR0044 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $559 $100 Implemented
AR0044 # 05 Y:1994 05 1994 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $196 $20 Implemented
KG0014 # 01 Y:1994 01 1994 INSTALL TIMERS AND/OR THERMOSTATS $6,524 $2,150 Not Implemented
KG0014 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,688 $829 Not Implemented
KG0014 # 03 Y:1994 03 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,618 $3,000 Not Implemented
KG0014 # 04 Y:1994 04 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,332 $15 Not Implemented
KG0014 # 05 Y:1994 05 1994 INSTALL OCCUPANCY SENSORS $80 $130 Not Implemented
CO0318 # 01 Y:1994 01 1994 REDUCE OR ELIMINATE WASTE $27,620 $15,000 Not Implemented
CO0318 # 02 Y:1994 02 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,830 $7,860 Implemented
CO0318 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $820 $820 Not Implemented
CO0318 # 04 Y:1994 04 1994 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER $2,210 $1,750 Implemented
CO0318 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,590 $2,260 Implemented
CO0318 # 06 Y:1994 06 1994 USE PHOTOCELL CONTROLS $1,580 $3,000 Not Implemented
CO0318 # 07 Y:1994 07 1994 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS $1,310 $1,300 Not Implemented
CO0318 # 08 Y:1994 08 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $880 $370 Implemented
CO0318 # 09 Y:1994 09 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $560 $960 Implemented
UD0444 # 01 Y:1994 01 1994 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $15,232 $15,000 Not Implemented
UD0444 # 02 Y:1994 02 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,000 $0 Implemented