Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,208
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0600 # 01 Y:2020 | 01 | 2020 | REDUCE SCRAP PRODUCTION | $80,293 | $41,423 | Not Implemented |
SD0600 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,211 | $2,620 | Implemented |
SD0600 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $869 | $450 | Implemented |
SD0600 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $514 | $520 | Not Implemented |
MZ0301 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,251 | $400 | Not Implemented |
MZ0301 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,114 | $4,500 | Implemented |
MZ0301 # 03 Y:2020 | 03 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,820 | $7,000 | Implemented |
MZ0301 # 04 Y:2020 | 04 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,146 | $7,360 | Not Implemented |
MZ0301 # 05 Y:2020 | 05 | 2020 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $2,963 | $4,300 | Not Implemented |
MZ0301 # 06 Y:2020 | 06 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,087 | $5,000 | Implemented |
MZ0301 # 07 Y:2020 | 07 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $604 | $200 | Implemented |
MZ0301 # 08 Y:2020 | 08 | 2020 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $304 | $52 | Implemented |
MZ0301 # 09 Y:2020 | 09 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $673 | $405 | Implemented |
MZ0301 # 10 Y:2020 | 10 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,307 | $4,100 | Implemented |
MZ0301 # 11 Y:2020 | 11 | 2020 | INSTALL OCCUPANCY SENSORS | $1,132 | $1,720 | Not Implemented |
GT0951 # 01 Y:2020 | 01 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $79,957 | $675 | Implemented |
GT0951 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $126,097 | $4,500 | Implemented |
GT0951 # 03 Y:2020 | 03 | 2020 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $18,092 | $2,000 | Not Implemented |
GT0951 # 04 Y:2020 | 04 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,307 | $2,255 | Implemented |
GT0951 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $54,280 | $66,564 | Implemented |
GT0951 # 06 Y:2020 | 06 | 2020 | INSTALL OCCUPANCY SENSORS | $21,155 | $29,319 | Not Implemented |
GT0951 # 07 Y:2020 | 07 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,162 | $4,561 | Implemented |
GT0951 # 08 Y:2020 | 08 | 2020 | OPTIMIZE PLANT POWER FACTOR | $9,097 | $34,730 | Not Implemented |
GT0951 # 09 Y:2020 | 09 | 2020 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $201,113 | $1,989,215 | Not Implemented |
SF0561 # 01 Y:2020 | 01 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,397 | $525 | Not Implemented |