IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0145 # 06 Y:1992 06 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $583 $500 Not Implemented
KU0369 # 01 Y:1992 01 1992 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $14,242 $0 Not Implemented
KU0369 # 02 Y:1992 02 1992 USE RADIANT HEATER FOR SPOT HEATING $10,390 $38,850 Not Implemented
KU0369 # 03 Y:1992 03 1992 INSTALL TIMERS AND/OR THERMOSTATS $1,781 $430 Implemented
KU0369 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $466 $1,769 Not Implemented
KU0369 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $366 $0 Not Implemented
KU0369 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $918 $750 Not Implemented
KU0369 # 07 Y:1992 07 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,856 $125 Implemented
KU0369 # 08 Y:1992 08 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,147 $0 Not Implemented
MA0240 # 01 Y:1992 01 1992 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $83,013 $80 Implemented
MA0240 # 02 Y:1992 02 1992 RECOVER WASTE HEAT FROM EQUIPMENT $17,964 $55,605 Not Implemented
MA0240 # 03 Y:1992 03 1992 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $16,723 $11 Implemented
MA0240 # 04 Y:1992 04 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,460 $2,355 Implemented
MA0240 # 05 Y:1992 05 1992 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,896 $0 Implemented
MA0240 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $1,400 $400 Implemented
MA0240 # 07 Y:1992 07 1992 REPAIR OR REPLACE STEAM TRAPS $1,348 $240 Implemented
MA0240 # 08 Y:1992 08 1992 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,022 $2,200 Implemented
UF0028 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $864 $2,517 Implemented
UF0028 # 02 Y:1992 02 1992 INSTALL SPECTRAL REFLECTORS / DELAMP $6,437 $2,400 Implemented
UF0028 # 03 Y:1992 03 1992 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,125 $1,660 Implemented
UF0028 # 04 Y:1992 04 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,440 $36,148 Implemented
UD0369 # 01 Y:1992 01 1992 OPTIMIZE PLANT POWER FACTOR $612 $1,600 Not Implemented
UD0369 # 02 Y:1992 02 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,020 $0 Implemented
UD0369 # 03 Y:1992 03 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,504 $0 Implemented
UD0369 # 04 Y:1992 04 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $850 $0 Implemented