Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,208
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0561 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,203 | $110 | Not Implemented |
SF0561 # 03 Y:2020 | 03 | 2020 | INSULATE BARE EQUIPMENT | $3,116 | $1,412 | Implemented |
SF0561 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,435 | $3,959 | Not Implemented |
SF0561 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,548 | $4,226 | Implemented |
SF0561 # 06 Y:2020 | 06 | 2020 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,263 | $18,437 | Not Implemented |
SF0561 # 07 Y:2020 | 07 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $35,550 | $236,909 | Implemented |
MI0378 # 01 Y:2020 | 01 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $12,828 | $480 | Implemented |
MI0378 # 02 Y:2020 | 02 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,840 | $2,673 | Not Implemented |
MI0378 # 03 Y:2020 | 03 | 2020 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $7,580 | $6,182 | Not Implemented |
MI0378 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,737 | $11,160 | Implemented |
MI0378 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,502 | $2,100 | Implemented |
MI0378 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,909 | $1,980 | Implemented |
MI0378 # 07 Y:2020 | 07 | 2020 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,694 | $1,195 | Implemented |
MI0378 # 08 Y:2020 | 08 | 2020 | INSTALL OCCUPANCY SENSORS | $1,344 | $1,042 | Not Implemented |
MI0378 # 09 Y:2020 | 09 | 2020 | USE PHOTOCELL CONTROLS | $981 | $1,141 | Not Implemented |
MI0378 # 10 Y:2020 | 10 | 2020 | ISOLATE HOT OR COLD EQUIPMENT | $671 | $560 | Not Implemented |
MZ0296 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $924 | $1,200 | Not Implemented |
MZ0296 # 02 Y:2020 | 02 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $669 | $200 | Not Implemented |
MZ0296 # 03 Y:2020 | 03 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,596 | $6,400 | Not Implemented |
MZ0296 # 04 Y:2020 | 04 | 2020 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,669 | $288 | Not Implemented |
MZ0296 # 05 Y:2020 | 05 | 2020 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $3,506 | $8,000 | Not Implemented |
MZ0296 # 06 Y:2020 | 06 | 2020 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $100,865 | $197,145 | Not Implemented |
MZ0296 # 07 Y:2020 | 07 | 2020 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $57,876 | $199,418 | Not Implemented |
MZ0296 # 08 Y:2020 | 08 | 2020 | INSTALL OCCUPANCY SENSORS | $336 | $360 | Not Implemented |
UD1023 # 01 Y:2020 | 01 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,882 | $0 | Not Implemented |