IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0123 # 08 Y:2019 08 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $758 $2,290 Implemented
IP0123 # 09 Y:2019 09 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,165 $13,663 Implemented
IP0123 # 10 Y:2019 10 2019 INSULATE BARE EQUIPMENT $153 $692 Not Implemented
IP0123 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $286 $7 Implemented
IP0123 # 02 Y:2019 02 2019 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $248 $0 Implemented
IP0123 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $442 $70 Implemented
IP0123 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $503 $100 Not Implemented
IP0123 # 05 Y:2019 05 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,980 $440 Implemented
IP0123 # 06 Y:2019 06 2019 OPTIMIZE PLANT POWER FACTOR $5,541 $9,685 Not Implemented
IP0123 # 07 Y:2019 07 2019 INSULATE BARE EQUIPMENT $96 $200 Not Implemented
IP0122 # 01 Y:2019 01 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $702 $0 Not Implemented
IP0122 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,930 $54 Implemented
IP0122 # 03 Y:2019 03 2019 OPTIMIZE PLANT POWER FACTOR $9,556 $3,958 Not Implemented
IP0122 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $162 $63 Not Implemented
IP0122 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,297 $22,990 Implemented
WV0581 # 01 Y:2019 01 2019 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $128,494 $314,600 Not Implemented
WV0581 # 02 Y:2019 02 2019 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $37,537 $5,500 Not Implemented
WV0581 # 03 Y:2019 03 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $28,868 $78,000 Implemented
WV0581 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,233 $58,107 Implemented
WV0581 # 05 Y:2019 05 2019 UPGRADE CONTROLS ON COMPRESSORS $9,387 $4,000 Implemented
WV0581 # 06 Y:2019 06 2019 RECYCLE WHITE WATER $8,651 $4,100 Implemented
WV0581 # 07 Y:2019 07 2019 DEVELOP A REPAIR/REPLACE POLICY $4,849 $738 Implemented
WV0581 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,540 $100 Implemented
WV0581 # 09 Y:2019 09 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $938 $0 Implemented
MI0354 # 01 Y:2019 01 2019 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $42,517 $105,476 Implemented