Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
853
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0795 # 09 Y:2010 | 09 | 2010 | INSTALL REPLACEMENT DOORS | $24,009 | $51,300 | Not Implemented |
OK0782 # 01 Y:2009 | 01 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $852 | $354 | Implemented |
OK0782 # 02 Y:2009 | 02 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,732 | $3,742 | Not Implemented |
OK0782 # 03 Y:2009 | 03 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,733 | $0 | Implemented |
OK0782 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,005 | $7,542 | Not Implemented |
OK0782 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,300 | $11,120 | Not Implemented |
OK0782 # 06 Y:2009 | 06 | 2009 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $804 | $4,800 | Not Implemented |
OK0782 # 07 Y:2009 | 07 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,815 | $820 | Implemented |
OK0782 # 08 Y:2009 | 08 | 2009 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $700 | $1,825 | Implemented |
OK0775 # 01 Y:2009 | 01 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,182 | $0 | Implemented |
OK0775 # 02 Y:2009 | 02 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,161 | $2,326 | Not Implemented |
OK0775 # 03 Y:2009 | 03 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,617 | $5,534 | Not Implemented |
OK0775 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,208 | $11,677 | Implemented |
OK0775 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,179 | $9,264 | Not Implemented |
OK0775 # 06 Y:2009 | 06 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,586 | $4,119 | Not Implemented |
OK0775 # 07 Y:2009 | 07 | 2009 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $5,419 | $386 | Not Implemented |
OK0775 # 08 Y:2009 | 08 | 2009 | USE POWER DURING OFF-PEAK PERIODS | $30,940 | $0 | Not Implemented |
OK0775 # 09 Y:2009 | 09 | 2009 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $19,665 | $140,000 | Not Implemented |
OK0775 # 10 Y:2009 | 10 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $3,858 | $2,925 | Implemented |
OK0772 # 01 Y:2009 | 01 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,160 | $0 | Implemented |
OK0772 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,160 | $0 | Implemented |
OK0772 # 03 Y:2009 | 03 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,094 | $353 | Not Implemented |
OK0772 # 04 Y:2009 | 04 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,498 | $2,767 | Not Implemented |
OK0772 # 05 Y:2009 | 05 | 2009 | OPERATE BOILERS ON HIGH FIRE SETTING | $4,261 | $17,500 | Implemented |
OK0772 # 06 Y:2009 | 06 | 2009 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $400 | $0 | Not Implemented |