IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

281

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0228 # 11 Y:2001 11 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $850 $2,547 Implemented
WV0228 # 12 Y:2001 12 2001 ADJUST PH FOR NEUTRALIZATION $11,300 $13,000 Not Implemented
WV0228 # 13 Y:2001 13 2001 INSTALL AUTOMATIC PACKING EQUIPMENT $110,000 $858,000 Not Implemented
WV0227 # 01 Y:2001 01 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,919 $750 Implemented
WV0227 # 02 Y:2001 02 2001 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,589 $1,980 Not Implemented
WV0227 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $913 $100 Implemented
WV0227 # 04 Y:2001 04 2001 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $704 $50 Not Implemented
WV0227 # 05 Y:2001 05 2001 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $603 $390 Implemented
WV0227 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $275 $112 Implemented
WV0227 # 07 Y:2001 07 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $31,855 $2,000 Implemented
WV0227 # 08 Y:2001 08 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $12,200 $1,000 Implemented
WV0227 # 09 Y:2001 09 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,150 $2,910 Implemented
WV0227 # 10 Y:2001 10 2001 RECOVER WASTE HEAT FROM EQUIPMENT $16,267 $3,000 Not Implemented
WV0227 # 11 Y:2001 11 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,814 $100 Implemented
WV0227 # 12 Y:2001 12 2001 ADJUST PH FOR NEUTRALIZATION $8,625 $13,725 Not Implemented
WV0227 # 13 Y:2001 13 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,200 $75 Implemented
WV0227 # 14 Y:2001 14 2001 INSTALL AUTOMATIC PACKING EQUIPMENT $110,000 $85,000 Not Implemented
WV0205 # 01 Y:2000 01 2000 RECOVER WASTE HEAT FROM EQUIPMENT $11,419 $800 Not Implemented
WV0205 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,709 $800 Not Implemented
WV0205 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $347 $519 Implemented
WV0205 # 04 Y:2000 04 2000 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $7,568 $3,000 Implemented
WV0205 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $394 $50 Implemented
WV0205 # 06 Y:2000 06 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $7,688 $7,933 Implemented
WV0205 # 07 Y:2000 07 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,511 $600 Not Implemented
WV0205 # 08 Y:2000 08 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,109 $1,500 Not Implemented