IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

415

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0264 # 04 Y:2022 04 2022 UPGRADE CONTROLS ON COMPRESSORS $2,600 $15,017 Not Implemented
IC0264 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $3,552 $15,893 Not Implemented
IC0264 # 06 Y:2022 06 2022 REDUCE VENTILATION AIR $1,650 $6,000 Implemented
UL2207 # 01 Y:2022 01 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,180 $0 Not Implemented
UL2207 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,984 $83,246 Not Implemented
UL2207 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,572 $18,120 Not Implemented
UL2207 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,876 $0 Not Implemented
UL2207 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,845 $30,000 Not Implemented
UL2207 # 06 Y:2022 06 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $178,671 $2,038,848 Not Implemented
UL2207 # 07 Y:2022 07 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $135,226 $2,377,313 Not Implemented
TT0280 # 01 Y:2022 01 2022 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $52,932 $4,800 Implemented
TT0280 # 02 Y:2022 02 2022 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $29,003 $9,880 Implemented
TT0280 # 03 Y:2022 03 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $26,518 $6,720 Not Implemented
TT0280 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $21,150 $0 Implemented
TT0280 # 05 Y:2022 05 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $19,766 $0 Implemented
TT0280 # 06 Y:2022 06 2022 INSTALL TIMERS AND/OR THERMOSTATS $14,562 $650 Not Implemented
TT0280 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,878 $5,100 Not Implemented
TT0280 # 08 Y:2022 08 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,072 $3,400 Not Implemented
TT0280 # 09 Y:2022 09 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,550 $0 Not Implemented
TT0280 # 10 Y:2022 10 2022 DEVELOP A REPAIR/REPLACE POLICY $298 $1,247 Not Implemented
TT0276 # 01 Y:2022 01 2022 ADOPT IN-HOUSE MATERIAL GENERATION $42,153 $40,000 Not Implemented
TT0276 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $125,911 $145,300 Not Implemented
TT0276 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $37,334 $25,000 Not Implemented
TT0276 # 04 Y:2022 04 2022 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $35,279 $40,000 Not Implemented
TT0276 # 05 Y:2022 05 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $22,303 $60 Implemented