IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

406

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0797 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $845 $500 Not Implemented
MA0797 # 04 Y:2019 04 2019 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $2,739 $3,000 Implemented
MA0797 # 01 Y:2019 01 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $12,419 $18,225 Not Implemented
MA0797 # 03 Y:2019 03 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,353 $500 Not Implemented
MA0797 # 02 Y:2019 02 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,247 $16,050 Not Implemented
MA0794 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $2,123 $4,092 Not Implemented
MA0794 # 02 Y:2018 02 2018 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $14,204 $51,700 Not Implemented
MA0794 # 04 Y:2018 04 2018 INSTALL TIMERS AND/OR THERMOSTATS $1,216 $852 Implemented
MA0794 # 05 Y:2018 05 2018 RECOVER WASTE HEAT FROM EQUIPMENT $710 $2,583 Not Implemented
MA0794 # 01 Y:2018 01 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $84,640 $121,500 Implemented
MA0780 # 01 Y:2017 01 2017 USE SOLAR HEAT FOR HEAT $66,074 $629,413 Not Implemented
MA0780 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $583 $100 Not Implemented
MA0780 # 03 Y:2017 03 2017 USE OPTIMUM THICKNESS INSULATION $575 $865 Not Implemented
MA0773 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,500 $1,000 Implemented
MA0773 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,580 $14,050 Implemented
MA0773 # 03 Y:2017 03 2017 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $5,593 $10,625 Implemented
MA0773 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,564 $6,660 Not Implemented
MA0773 # 01 Y:2017 01 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,653 $30,000 Not Implemented
MA0773 # 06 Y:2017 06 2017 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $501 $100 Not Implemented
MA0769 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $90,487 $39,330 Implemented
MA0769 # 02 Y:2017 02 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $30,931 $24,720 Not Implemented
MA0769 # 03 Y:2017 03 2017 INSULATE BARE EQUIPMENT $12,391 $11,273 Not Implemented
MA0769 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,874 $7,200 Not Implemented
MA0769 # 04 Y:2017 04 2017 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $8,620 $57,572 Not Implemented
MA0738 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $4,433 $8,441 Not Implemented