IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

415

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2403 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,934 $0 n/a
UC2403 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,880 $1,300 n/a
UC2403 # 09 Y:2024 09 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $49,517 $311,208 n/a
UC2403 # 06 Y:2024 06 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,576 $50 n/a
UC2403 # 04 Y:2024 04 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,103 $428 n/a
UC2403 # 08 Y:2024 08 2024 INSTALL TIMERS AND/OR THERMOSTATS $1,116 $333 n/a
UC2403 # 01 Y:2024 01 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,885 $0 n/a
UC2403 # 02 Y:2024 02 2024 PAY UTILITY BILLS ON TIME $64 $0 n/a
UC2403 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $753 $2,612 n/a
MA0797 # 01 Y:2019 01 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $12,419 $18,225 Not Implemented
MA0797 # 04 Y:2019 04 2019 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $2,739 $3,000 Implemented
MA0797 # 02 Y:2019 02 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,247 $16,050 Not Implemented
MA0797 # 03 Y:2019 03 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,353 $500 Not Implemented
MA0797 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $845 $500 Not Implemented
MA0794 # 02 Y:2018 02 2018 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $14,204 $51,700 Not Implemented
MA0794 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $2,123 $4,092 Not Implemented
MA0794 # 01 Y:2018 01 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $84,640 $121,500 Implemented
MA0794 # 04 Y:2018 04 2018 INSTALL TIMERS AND/OR THERMOSTATS $1,216 $852 Implemented
MA0794 # 05 Y:2018 05 2018 RECOVER WASTE HEAT FROM EQUIPMENT $710 $2,583 Not Implemented
MA0780 # 01 Y:2017 01 2017 USE SOLAR HEAT FOR HEAT $66,074 $629,413 Not Implemented
MA0780 # 03 Y:2017 03 2017 USE OPTIMUM THICKNESS INSULATION $575 $865 Not Implemented
MA0780 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $583 $100 Not Implemented
MA0773 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,500 $1,000 Implemented
MA0773 # 06 Y:2017 06 2017 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $501 $100 Not Implemented
MA0773 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,564 $6,660 Not Implemented