Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
415
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2403 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,934 | $0 | n/a |
UC2403 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,880 | $1,300 | n/a |
UC2403 # 09 Y:2024 | 09 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,517 | $311,208 | n/a |
UC2403 # 06 Y:2024 | 06 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,576 | $50 | n/a |
UC2403 # 04 Y:2024 | 04 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,103 | $428 | n/a |
UC2403 # 08 Y:2024 | 08 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $1,116 | $333 | n/a |
UC2403 # 01 Y:2024 | 01 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $4,885 | $0 | n/a |
UC2403 # 02 Y:2024 | 02 | 2024 | PAY UTILITY BILLS ON TIME | $64 | $0 | n/a |
UC2403 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $753 | $2,612 | n/a |
MA0797 # 01 Y:2019 | 01 | 2019 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $12,419 | $18,225 | Not Implemented |
MA0797 # 04 Y:2019 | 04 | 2019 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $2,739 | $3,000 | Implemented |
MA0797 # 02 Y:2019 | 02 | 2019 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $4,247 | $16,050 | Not Implemented |
MA0797 # 03 Y:2019 | 03 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,353 | $500 | Not Implemented |
MA0797 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $845 | $500 | Not Implemented |
MA0794 # 02 Y:2018 | 02 | 2018 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $14,204 | $51,700 | Not Implemented |
MA0794 # 03 Y:2018 | 03 | 2018 | INSULATE BARE EQUIPMENT | $2,123 | $4,092 | Not Implemented |
MA0794 # 01 Y:2018 | 01 | 2018 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $84,640 | $121,500 | Implemented |
MA0794 # 04 Y:2018 | 04 | 2018 | INSTALL TIMERS AND/OR THERMOSTATS | $1,216 | $852 | Implemented |
MA0794 # 05 Y:2018 | 05 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $710 | $2,583 | Not Implemented |
MA0780 # 01 Y:2017 | 01 | 2017 | USE SOLAR HEAT FOR HEAT | $66,074 | $629,413 | Not Implemented |
MA0780 # 03 Y:2017 | 03 | 2017 | USE OPTIMUM THICKNESS INSULATION | $575 | $865 | Not Implemented |
MA0780 # 02 Y:2017 | 02 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $583 | $100 | Not Implemented |
MA0773 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,500 | $1,000 | Implemented |
MA0773 # 06 Y:2017 | 06 | 2017 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $501 | $100 | Not Implemented |
MA0773 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,564 | $6,660 | Not Implemented |