IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

118

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0326 # 07 Y:2002 07 2002 $12,362 $100 n/a
AS0326 # 06 Y:2002 06 2002 $10,080 $750 n/a
AS0326 # 05 Y:2002 05 2002 $23,920 $582 n/a
AS0326 # 04 Y:2002 04 2002 $11,799 $489 n/a
AS0326 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,936 $0 n/a
AS0326 # 02 Y:2002 02 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,641 $1,600 n/a
AS0326 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,817 $100 n/a
NV0166 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $321 $255 n/a
NV0166 # 01 Y:2000 01 2000 AIR CONDITION ONLY SPACE NECESSARY $32,352 $17,000 n/a
NV0166 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $180 $194 n/a
NV0166 # 05 Y:2000 05 2000 $195,000 $3,465 n/a
NV0166 # 04 Y:2000 04 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $81 $0 n/a
NV0148 # 04 Y:2000 04 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $704 $0 Implemented
NV0148 # 01 Y:2000 01 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $768 $1,500 Implemented
NV0148 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,562 $22,374 Implemented
NV0148 # 03 Y:2000 03 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,341 $1,391 Not Implemented
NV0138 # 05 Y:1999 05 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $708 $1,391 Implemented
NV0138 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,227 $6,280 Not Implemented
NV0138 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $932 $2,270 Not Implemented
NV0138 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,007 $400 Implemented
NV0138 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $255 $450 Implemented
NV0137 # 01 Y:1999 01 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,544 $1,000 Not Implemented
NV0137 # 04 Y:1999 04 1999 USE RADIANT HEATER FOR SPOT HEATING $2,377 $4,576 Not Implemented
NV0137 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $372 $300 Implemented
NV0137 # 03 Y:1999 03 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $198 $25 Implemented