Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
70
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0263 # 11 Y:2025 | 11 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $8,090 | $5,000 | n/a |
UU0263 # 01 Y:2025 | 01 | 2025 | INSTALL COMMON HEADER ON COMPRESSORS | $7,583 | $46,630 | n/a |
UU0263 # 12 Y:2025 | 12 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $32,910 | $158,576 | n/a |
UU0263 # 02 Y:2025 | 02 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,105 | $5,100 | n/a |
UU0263 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,270 | $7,380 | n/a |
UU0263 # 04 Y:2025 | 04 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,805 | $8,150 | n/a |
UU0263 # 05 Y:2025 | 05 | 2025 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $3,948 | $2,110 | n/a |
UU0263 # 03 Y:2025 | 03 | 2025 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,365 | $1,730 | n/a |
UU0263 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $945 | $3,580 | n/a |
UU0263 # 06 Y:2025 | 06 | 2025 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $4,840 | $11,200 | n/a |
UU0263 # 09 Y:2025 | 09 | 2025 | OPTIMIZE PLANT POWER FACTOR | $3,940 | $9,000 | n/a |
UU0263 # 10 Y:2025 | 10 | 2025 | PAY UTILITY BILLS ON TIME | $1,860 | $1,500 | n/a |
UU0184 # 03 Y:2021 | 03 | 2021 | OPTIMIZE PLANT POWER FACTOR | $2,375 | $6,744 | Not Implemented |
UU0184 # 04 Y:2021 | 04 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,530 | $500 | Not Implemented |
UU0184 # 01 Y:2021 | 01 | 2021 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $26,453 | $92,586 | Implemented |
UU0184 # 06 Y:2021 | 06 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $546 | $550 | Not Implemented |
UU0184 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,459 | $2,700 | Not Implemented |
UU0184 # 05 Y:2021 | 05 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $731 | $2,000 | Not Implemented |
UU0100 # 05 Y:2006 | 05 | 2006 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $15,000 | $10,000 | Not Implemented |
UU0100 # 06 Y:2006 | 06 | 2006 | OPTIMIZE PLANT POWER FACTOR | $4,280 | $4,140 | Not Implemented |
UU0100 # 04 Y:2006 | 04 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $290 | $740 | Not Implemented |
UU0100 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,490 | $165 | Not Implemented |
UU0100 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,510 | $830 | Not Implemented |
UU0100 # 01 Y:2006 | 01 | 2006 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $21,720 | $10,000 | Not Implemented |
UU0096 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,320 | $5,000 | Not Implemented |