IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0184 # 03 Y:2021 03 2021 OPTIMIZE PLANT POWER FACTOR $2,375 $6,744 Not Implemented
UU0184 # 04 Y:2021 04 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $1,530 $500 Not Implemented
UU0184 # 05 Y:2021 05 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $731 $2,000 Not Implemented
UU0184 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,459 $2,700 Not Implemented
UU0184 # 06 Y:2021 06 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $546 $550 Not Implemented
UU0184 # 01 Y:2021 01 2021 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $26,453 $92,586 Implemented
UU0100 # 06 Y:2006 06 2006 OPTIMIZE PLANT POWER FACTOR $4,280 $4,140 Not Implemented
UU0100 # 05 Y:2006 05 2006 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $15,000 $10,000 Not Implemented
UU0100 # 04 Y:2006 04 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $290 $740 Not Implemented
UU0100 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,490 $165 Not Implemented
UU0100 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,510 $830 Not Implemented
UU0100 # 01 Y:2006 01 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $21,720 $10,000 Not Implemented
UU0096 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $840 $330 Not Implemented
UU0096 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,320 $5,000 Not Implemented
UU0096 # 03 Y:2005 03 2005 USE PHOTOCELL CONTROLS $2,530 $2,040 Not Implemented
UU0096 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $3,320 $1,950 Not Implemented
UU0096 # 05 Y:2005 05 2005 RECOVER AND REUSE WASTE MATERIAL $9,000 $0 Not Implemented
UU0058 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,398 $308 Not Implemented
UU0058 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,714 $1,010 Implemented
UU0058 # 06 Y:2004 06 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,353 $0 Implemented
UU0058 # 08 Y:2004 08 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $584 $0 Not Implemented
UU0058 # 07 Y:2004 07 2004 COMBINE UTILITY METERS $10,270 $0 Implemented
UU0058 # 01 Y:2004 01 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $54,124 $150,000 Not Implemented
UU0058 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $6,081 $5,369 Not Implemented
UU0058 # 02 Y:2004 02 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $21,233 $78,000 Not Implemented