IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

258

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0619 # 02 Y:2022 02 2022 UPGRADE CONTROLS ON COMPRESSORS $41,175 $63,410 Not Implemented
WV0619 # 03 Y:2022 03 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $31,971 $11,460 Not Implemented
WV0619 # 10 Y:2022 10 2022 INSULATE BARE EQUIPMENT $5,912 $2,928 Implemented
WV0619 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $25,562 $534 Implemented
WV0619 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,611 $45,435 Not Implemented
WV0619 # 09 Y:2022 09 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,727 $3,024 Implemented
WV0619 # 08 Y:2022 08 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $11,821 $43,746 Not Implemented
WV0619 # 06 Y:2022 06 2022 DEVELOP A REPAIR/REPLACE POLICY $14,226 $1,514 Implemented
WV0619 # 01 Y:2022 01 2022 RECOVER WASTE HEAT FROM EQUIPMENT $46,415 $81,000 Not Implemented
WV0619 # 05 Y:2022 05 2022 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $20,481 $1,000 Implemented
WV0618 # 02 Y:2022 02 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,969 $4,600 Not Implemented
WV0618 # 07 Y:2022 07 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $354 $90 Implemented
WV0618 # 04 Y:2022 04 2022 UPGRADE CONTROLS ON COMPRESSORS $1,409 $3,970 Not Implemented
WV0618 # 03 Y:2022 03 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,452 $1,125 Implemented
WV0618 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,096 $10,131 Not Implemented
WV0618 # 06 Y:2022 06 2022 DEVELOP A REPAIR/REPLACE POLICY $369 $1,670 Implemented
WV0618 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,089 $525 Implemented
WV0617 # 09 Y:2021 09 2021 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $454 $1,000 Implemented
WV0617 # 10 Y:2021 10 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $450 $638 Implemented
WV0617 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,562 $209 Implemented
WV0617 # 05 Y:2021 05 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $973 $655 Implemented
WV0617 # 06 Y:2021 06 2021 OPTIMIZE PLANT POWER FACTOR $811 $2,732 Implemented
WV0617 # 02 Y:2021 02 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,162 $5,562 Not Implemented
WV0617 # 03 Y:2021 03 2021 UPGRADE CONTROLS ON COMPRESSORS $2,975 $13,590 Not Implemented
WV0617 # 07 Y:2021 07 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $743 $2,460 Not Implemented