IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

402

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0426 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $87 $141 Not Implemented
GT0426 # 01 Y:1990 01 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,559 $300 Implemented
GT0426 # 04 Y:1990 04 1990 INSTALL TIMERS AND/OR THERMOSTATS $270 $0 Implemented
GT0426 # 09 Y:1990 09 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,331 $0 Implemented
GT0426 # 03 Y:1990 03 1990 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $1,520 $500 Not Implemented
GT0426 # 07 Y:1990 07 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $419 $358 Implemented
GT0426 # 02 Y:1990 02 1990 KEEP BOILER TUBES CLEAN $257 $200 Implemented
GT0426 # 08 Y:1990 08 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $480 $0 Implemented
GT0426 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $328 $133 Implemented
AM0105 # 06 Y:1990 06 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,800 $400 Implemented
OK0332 # 06 Y:1990 06 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,410 $1,070 Implemented
AM0105 # 02 Y:1990 02 1990 OPTIMIZE PLANT POWER FACTOR $7,790 $21,500 Implemented
AM0105 # 04 Y:1990 04 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,000 $0 Implemented
OK0332 # 05 Y:1990 05 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,085 $0 Implemented
OK0332 # 02 Y:1990 02 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,898 $0 Not Implemented
AM0105 # 07 Y:1990 07 1990 IMPROVE LUBRICATION PRACTICES $1,400 $0 Not Implemented
AM0105 # 08 Y:1990 08 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $180 $170 Implemented
OK0332 # 04 Y:1990 04 1990 RECOVER WASTE HEAT FROM EQUIPMENT $7,747 $1,641 Implemented
AM0105 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,600 $500 Implemented
AM0105 # 01 Y:1990 01 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,500 $27,000 Not Implemented
OK0332 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $98 $102 Implemented
AM0105 # 05 Y:1990 05 1990 INSTALL SET-BACK TIMERS $3,860 $0 Not Implemented
OK0332 # 01 Y:1990 01 1990 INSTALL TIMERS AND/OR THERMOSTATS $1,937 $900 Implemented
AM0104 # 01 Y:1990 01 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,160 $10,750 Not Implemented
AM0104 # 02 Y:1990 02 1990 OPTIMIZE PLANT POWER FACTOR $4,050 $4,800 Not Implemented