IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

340

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0010 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,409 $0 Implemented
DL0010 # 04 Y:2007 04 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,529 $450 Implemented
DL0010 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $454 $524 Not Implemented
DL0010 # 02 Y:2007 02 2007 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $9,440 $2,500 Not Implemented
DL0010 # 01 Y:2007 01 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $10,964 $2,872 Implemented
DL0010 # 06 Y:2007 06 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $622 $622 Not Implemented
DL0010 # 03 Y:2007 03 2007 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,305 $225 Implemented
UW0009 # 07 Y:2007 07 2007 DEVELOP A REPAIR/REPLACE POLICY $3,371 $1,984 Implemented
UW0009 # 04 Y:2007 04 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,031 $7,140 Implemented
UW0009 # 01 Y:2007 01 2007 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $93,799 $136,650 Not Implemented
UW0009 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,889 $1,720 Not Implemented
UW0009 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,369 $138,420 Not Implemented
UW0009 # 06 Y:2007 06 2007 IMPROVE COMBUSTION CONTROL CAPABILITY $4,114 $3,000 Not Implemented
UW0009 # 05 Y:2007 05 2007 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION $11,196 $2,080 Not Implemented
OR0523 # 03 Y:2007 03 2007 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,350,000 $32,700 Not Implemented
OR0523 # 05 Y:2007 05 2007 COVER OPEN TANKS $3,000 $9,000 Not Implemented
OR0523 # 01 Y:2007 01 2007 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $35,000 $60,000 Implemented
OR0523 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $1,220 $1,160 Implemented
OR0523 # 02 Y:2007 02 2007 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $77,000 $5,000 Not Implemented
UD0770 # 11 Y:2007 11 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $448 $5,050 Implemented
UD0770 # 08 Y:2007 08 2007 DEVELOP A REPAIR/REPLACE POLICY $7,672 $42,117 Implemented
UD0770 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,512 $2,280 Implemented
UD0770 # 01 Y:2007 01 2007 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $309,378 $0 Implemented
UD0770 # 06 Y:2007 06 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,018 $40,083 Not Implemented
UD0770 # 05 Y:2007 05 2007 OPTIMIZE PLANT POWER FACTOR $14,976 $120,000 Not Implemented