Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
13,219
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0010 # 01 Y:2007 | 01 | 2007 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $10,964 | $2,872 | Implemented |
DL0010 # 04 Y:2007 | 04 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,529 | $450 | Implemented |
DL0010 # 06 Y:2007 | 06 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $622 | $622 | Not Implemented |
DL0010 # 05 Y:2007 | 05 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,409 | $0 | Implemented |
DL0010 # 07 Y:2007 | 07 | 2007 | INSTALL OCCUPANCY SENSORS | $454 | $524 | Not Implemented |
DL0010 # 03 Y:2007 | 03 | 2007 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $4,305 | $225 | Implemented |
DL0010 # 02 Y:2007 | 02 | 2007 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $9,440 | $2,500 | Not Implemented |
UW0009 # 01 Y:2007 | 01 | 2007 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $93,799 | $136,650 | Not Implemented |
UW0009 # 07 Y:2007 | 07 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $3,371 | $1,984 | Implemented |
UW0009 # 04 Y:2007 | 04 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,031 | $7,140 | Implemented |
UW0009 # 02 Y:2007 | 02 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,889 | $1,720 | Not Implemented |
UW0009 # 06 Y:2007 | 06 | 2007 | IMPROVE COMBUSTION CONTROL CAPABILITY | $4,114 | $3,000 | Not Implemented |
UW0009 # 05 Y:2007 | 05 | 2007 | RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION | $11,196 | $2,080 | Not Implemented |
UW0009 # 03 Y:2007 | 03 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,369 | $138,420 | Not Implemented |
OR0523 # 03 Y:2007 | 03 | 2007 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,350,000 | $32,700 | Not Implemented |
OR0523 # 04 Y:2007 | 04 | 2007 | INSULATE BARE EQUIPMENT | $1,220 | $1,160 | Implemented |
OR0523 # 01 Y:2007 | 01 | 2007 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $35,000 | $60,000 | Implemented |
OR0523 # 02 Y:2007 | 02 | 2007 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $77,000 | $5,000 | Not Implemented |
OR0523 # 05 Y:2007 | 05 | 2007 | COVER OPEN TANKS | $3,000 | $9,000 | Not Implemented |
UD0770 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $36,512 | $2,280 | Implemented |
UD0770 # 03 Y:2007 | 03 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $40,049 | $2,700 | Implemented |
UD0770 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $47,879 | $52,520 | Implemented |
UD0770 # 05 Y:2007 | 05 | 2007 | OPTIMIZE PLANT POWER FACTOR | $14,976 | $120,000 | Not Implemented |
UD0770 # 08 Y:2007 | 08 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $7,672 | $42,117 | Implemented |
UD0770 # 06 Y:2007 | 06 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,018 | $40,083 | Not Implemented |