IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

394

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0227 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,441 $1,500 Not Implemented
IC0227 # 01 Y:2019 01 2019 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,221 $800 Not Implemented
IC0227 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,117 $7,146 Not Implemented
IC0227 # 05 Y:2019 05 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,871 $28,000 Not Implemented
IC0227 # 04 Y:2019 04 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,978 $9,600 Not Implemented
UK1915 # 05 Y:2019 05 2019 REPLACE TREATED WATER WITH WELL / SURFACE WATER $53,903 $10,200 n/a
UK1915 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,711 $2,510 n/a
UK1915 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,983 $21,695 n/a
UK1915 # 06 Y:2019 06 2019 INSULATE BARE EQUIPMENT $13,534 $26,305 n/a
UK1915 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $259 $260 n/a
UK1915 # 07 Y:2019 07 2019 OPTIMIZE PLANT POWER FACTOR $127,719 $54,495 n/a
UK1915 # 02 Y:2019 02 2019 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $7,951 $17,032 n/a
IC0226 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $919 $689 Not Implemented
IC0226 # 05 Y:2019 05 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $1,367 $0 Not Implemented
IC0226 # 04 Y:2019 04 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $343 $1,200 Not Implemented
IC0226 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $650 $60 Not Implemented
IC0226 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,608 $4,300 Not Implemented
IC0226 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,094 $167 Not Implemented
IC0225 # 07 Y:2019 07 2019 USE RADIANT HEATER FOR SPOT HEATING $10,365 $18,280 Not Implemented
IC0225 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,947 $3,110 Implemented
IC0225 # 01 Y:2019 01 2019 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $44,444 $23,100 Implemented
IC0225 # 03 Y:2019 03 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,600 $105 Not Implemented
IC0225 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,711 $3,850 Not Implemented
IC0225 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,274 $4,150 Implemented
IC0225 # 06 Y:2019 06 2019 REPAIR OR REPLACE STEAM TRAPS $2,596 $652 Implemented