Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
43
matching recommendationsSIC | 341 | Metal Cans And Shipping Containers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0509 # 09 Y:2015 | 09 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $553 | $634 | Implemented |
WV0509 # 08 Y:2015 | 08 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $599 | $182 | Implemented |
WV0509 # 06 Y:2015 | 06 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,057 | $4,884 | Implemented |
WV0509 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,146 | $3,449 | Implemented |
WV0509 # 03 Y:2015 | 03 | 2015 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $6,021 | $1,000 | Implemented |
WV0509 # 05 Y:2015 | 05 | 2015 | INSULATE BARE EQUIPMENT | $2,835 | $885 | Implemented |
WV0480 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,022 | $11,662 | Implemented |
WV0480 # 12 Y:2014 | 12 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $783 | $396 | Implemented |
WV0480 # 11 Y:2014 | 11 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $934 | $1,078 | Implemented |
WV0480 # 06 Y:2014 | 06 | 2014 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,967 | $1,000 | Implemented |
WV0480 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,543 | $3,291 | Implemented |
WV0480 # 10 Y:2014 | 10 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,088 | $500 | Implemented |
WV0359 # 06 Y:2007 | 06 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $5,087 | $1,973 | Implemented |
WV0359 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,306 | $18,395 | Implemented |
WV0359 # 04 Y:2007 | 04 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,479 | $550 | Implemented |
WV0359 # 03 Y:2007 | 03 | 2007 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,631 | $3,500 | Implemented |
WV0359 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,126 | $26,364 | Implemented |
WV0359 # 09 Y:2007 | 09 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,391 | $0 | Implemented |
WV0359 # 10 Y:2007 | 10 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,313 | $850 | Implemented |
WV0359 # 08 Y:2007 | 08 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,840 | $2,123 | Implemented |
WV0359 # 11 Y:2007 | 11 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $538 | $131 | Implemented |
WV0359 # 07 Y:2007 | 07 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,874 | $300 | Implemented |
WV0228 # 06 Y:2001 | 06 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,801 | $60 | Implemented |
WV0228 # 08 Y:2001 | 08 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,128 | $1,200 | Implemented |
WV0228 # 11 Y:2001 | 11 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $850 | $2,547 | Implemented |