IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

978

matching recommendations
Reset
SIC 341 Metal Cans And Shipping Containers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0583 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,970 $37,470 Not Implemented
CO0583 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,400 $9,510 Implemented
CO0583 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,800 $2,380 Implemented
CO0583 # 09 Y:2006 09 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $1,450 $18,370 Not Implemented
AM0499 # 01 Y:2005 01 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,800 $27,700 Implemented
AM0499 # 02 Y:2005 02 2005 REUSE RAGS UNTIL COMPLETELY SOILED $12,000 $0 Implemented
AM0499 # 03 Y:2005 03 2005 USE SYNTHETIC LUBRICANT $11,335 $0 Implemented
AM0499 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,110 $2,800 Implemented
AM0499 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,975 $0 Implemented
AM0499 # 06 Y:2005 06 2005 OPTIMIZE PLANT POWER FACTOR $2,270 $5,600 Not Implemented
AM0499 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,380 $1,080 Not Implemented
AM0499 # 08 Y:2005 08 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $735 $0 Implemented
AM0499 # 09 Y:2005 09 2005 USE OPTIMUM THICKNESS INSULATION $505 $35 Not Implemented
AM0499 # 10 Y:2005 10 2005 USE OPTIMUM THICKNESS INSULATION $270 $40 Not Implemented
SD0354 # 01 Y:2004 01 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,786 $68,250 Not Implemented
SD0354 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,143 $43,000 Not Implemented
SD0354 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,424 $320 Implemented
SD0354 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,367 $18,600 Implemented
SD0354 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,079 $398 Implemented
TA0089 # 01 Y:2004 01 2004 MOVE BOILER TO MORE EFFICIENT LOCATION $87,420 $4,860 Implemented
TA0089 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $45,060 $540 Implemented
TA0089 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $10,000 $3,200 Implemented
TA0089 # 04 Y:2004 04 2004 USE MINIMUM SAFE OVEN VENTILATION $1,890 $1,500 Implemented
TA0089 # 05 Y:2004 05 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,740 $0 Implemented
WV0298 # 11 Y:2004 11 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $762 $750 Implemented