IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

94

matching recommendations
Reset
SIC 341 Metal Cans And Shipping Containers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0298 # 04 Y:2004 04 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,447 $220 Implemented
WV0298 # 10 Y:2004 10 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $794 $1,825 Not Implemented
WV0298 # 09 Y:2004 09 2004 DEVELOP A REPAIR/REPLACE POLICY $736 $705 Implemented
WV0298 # 01 Y:2004 01 2004 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $3,459 $2,100 Not Implemented
WV0298 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $2,066 $1,286 Not Implemented
WV0298 # 03 Y:2004 03 2004 DEVELOP A REPAIR/REPLACE POLICY $2,864 $1,928 Not Implemented
WV0298 # 11 Y:2004 11 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $762 $750 Implemented
WV0298 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,877 $240 Implemented
UD0679 # 10 Y:2003 10 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,739 $3,618 n/a
UD0679 # 02 Y:2003 02 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $52,385 $1,125 n/a
UD0679 # 09 Y:2003 09 2003 DISCONNECT BALLASTS $3,797 $132 n/a
UD0679 # 11 Y:2003 11 2003 INSTALL OCCUPANCY SENSORS $232 $110 n/a
UD0679 # 08 Y:2003 08 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,200 $1,750 n/a
UD0679 # 07 Y:2003 07 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,070 $7,100 n/a
UD0679 # 06 Y:2003 06 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $7,398 $0 n/a
UD0679 # 05 Y:2003 05 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,465 $200 n/a
UD0679 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,330 $1,100 n/a
UD0679 # 03 Y:2003 03 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $12,046 $270 n/a
UD0679 # 01 Y:2003 01 2003 REDUCE VENTILATION AIR $241,706 $-3,800,000 n/a
WV0235 # 09 Y:2002 09 2002 $14,000 $6,000 Not Implemented
WV0235 # 08 Y:2002 08 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,968 $2,500 Not Implemented
WV0235 # 07 Y:2002 07 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,700 $100 Implemented
WV0235 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,512 $125 Implemented
WV0235 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,013 $444 Not Implemented
WV0235 # 04 Y:2002 04 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $9,017 $750 Implemented