Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsSIC | 341 | Metal Cans And Shipping Containers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0366 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $147,343 | $2,297,063 | n/a |
MZ0366 # 04 Y:2024 | 04 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $11,668 | $59,968 | n/a |
MZ0366 # 03 Y:2024 | 03 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,674 | $14,000 | n/a |
MZ0366 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,395 | $800 | n/a |
MZ0366 # 01 Y:2024 | 01 | 2024 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $21,410 | $168,000 | n/a |
NL0076 # 07 Y:2022 | 07 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,084 | $35 | Not Implemented |
NL0076 # 06 Y:2022 | 06 | 2022 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $4,338 | $7,210 | Implemented |
NL0076 # 05 Y:2022 | 05 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,194 | $140 | Implemented |
NL0076 # 04 Y:2022 | 04 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,880 | $12,650 | Not Implemented |
NL0076 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,256 | $4,500 | Implemented |
NL0076 # 02 Y:2022 | 02 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $24,481 | $25,000 | Not Implemented |
NL0076 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $42,345 | $20,000 | Not Implemented |
MZ0294 # 07 Y:2020 | 07 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $35,523 | $60,200 | Not Implemented |
MZ0294 # 06 Y:2020 | 06 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $542 | $240 | Not Implemented |
MZ0294 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $506 | $50 | Implemented |
MZ0294 # 04 Y:2020 | 04 | 2020 | INSTALL SPECTRAL REFLECTORS / DELAMP | $519 | $160 | Not Implemented |
MZ0294 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $1,295 | $2,760 | Implemented |
MZ0294 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,816 | $13,638 | Not Implemented |
MZ0294 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $75,290 | $44,400 | Not Implemented |
IA0110 # 01 Y:1995 | 01 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,304 | $79,400 | Implemented |
IA0110 # 07 Y:1995 | 07 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $144 | $270 | Implemented |
IA0110 # 06 Y:1995 | 06 | 1995 | INSTALL OCCUPANCY SENSORS | $203 | $539 | Not Implemented |
IA0110 # 05 Y:1995 | 05 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,877 | $8,050 | Not Implemented |
IA0110 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,911 | $520 | Not Implemented |
IA0110 # 03 Y:1995 | 03 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,217 | $1,816 | Not Implemented |