IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 341 Metal Cans And Shipping Containers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0165 # 07 Y:2009 07 2009 $6,833 $45,400 Implemented
IC0165 # 05 Y:2009 05 2009 $197 $485 Implemented
IC0165 # 04 Y:2009 04 2009 $573 $575 Implemented
IC0165 # 03 Y:2009 03 2009 $3,581 $0 Implemented
BD0330 # 11 Y:2007 11 2007 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $307,692 $5,801 Implemented
BD0330 # 08 Y:2007 08 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $442 $2 Implemented
BD0330 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,489 $501 Implemented
BD0330 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $160 $126 Implemented
BD0330 # 03 Y:2007 03 2007 INSTALL OCCUPANCY SENSORS $1,189 $2,100 Implemented
BD0330 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,225 $8,850 Implemented
BD0330 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,133 $5,400 Implemented
BD0118 # 05 Y:1998 05 1998 INSTALL OCCUPANCY SENSORS $1,186 $700 Implemented
BD0118 # 12 Y:1998 12 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $374 $360 Implemented
BD0118 # 11 Y:1998 11 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $448 $450 Implemented
BD0118 # 10 Y:1998 10 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $501 $0 Implemented
BD0118 # 08 Y:1998 08 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $774 $350 Implemented
BD0118 # 06 Y:1998 06 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $957 $800 Implemented
BD0118 # 01 Y:1998 01 1998 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $32,188 $123,000 Implemented
BD0094 # 08 Y:1997 08 1997 $150,800 $2,000 Implemented
BD0094 # 07 Y:1997 07 1997 TREAT AND REUSE RINSE WATERS $16,735 $34,000 Implemented
BD0094 # 06 Y:1997 06 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $192,343 $16,000 Implemented
BD0094 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,560 $4,430 Implemented
BD0094 # 03 Y:1997 03 1997 INSULATE BARE EQUIPMENT $4,842 $8,668 Implemented