IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 341 Metal Cans And Shipping Containers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0295 # 07 Y:2024 07 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $843 $490 n/a
IC0295 # 06 Y:2024 06 2024 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $16,247 $16,893 n/a
IC0295 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,221 $6,343 n/a
IC0295 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,828 $7,539 n/a
IC0295 # 03 Y:2024 03 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $13,248 $0 n/a
IC0295 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,690 $3,413 n/a
IC0295 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,497 $558 n/a
IC0240 # 01 Y:2020 01 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $47,834 $36,263 Implemented
IC0240 # 02 Y:2020 02 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $260 $444 Implemented
IC0240 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $30,912 $18,940 Implemented
IC0240 # 04 Y:2020 04 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $16,845 $0 Implemented
IC0240 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,653 $5,000 Implemented
IC0240 # 06 Y:2020 06 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,057 $4,858 Not Implemented
IC0230 # 02 Y:2020 02 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,781 $13,282 Not Implemented
IC0230 # 06 Y:2020 06 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $45,814 $7,700 Not Implemented
IC0230 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $212,444 $108,320 Implemented
IC0230 # 04 Y:2020 04 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $15,197 $0 Not Implemented
IC0230 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,524 $50 Implemented
IC0230 # 01 Y:2020 01 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,837 $1,500 Not Implemented
TS0007 # 01 Y:1984 01 1984 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $12,640 $34,000 Not Implemented
TS0007 # 02 Y:1984 02 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $13,248 $25,350 Not Implemented
TS0007 # 03 Y:1984 03 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,860 $0 Implemented
TS0007 # 05 Y:1984 05 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $4,243 $0 Implemented