Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
39
matching recommendationsSIC | 341 | Metal Cans And Shipping Containers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0205 # 13 Y:2000 | 13 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $5,182 | $7,000 | Not Implemented |
WV0205 # 10 Y:2000 | 10 | 2000 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $9,414 | $1,000 | Implemented |
WV0205 # 09 Y:2000 | 09 | 2000 | USE OPTIMUM THICKNESS INSULATION | $171 | $375 | Implemented |
WV0205 # 08 Y:2000 | 08 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,109 | $1,500 | Not Implemented |
WV0205 # 07 Y:2000 | 07 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,511 | $600 | Not Implemented |
WV0205 # 06 Y:2000 | 06 | 2000 | INSTALL SPECTRAL REFLECTORS / DELAMP | $7,688 | $7,933 | Implemented |
WV0205 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $394 | $50 | Implemented |
WV0205 # 04 Y:2000 | 04 | 2000 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $7,568 | $3,000 | Implemented |
WV0205 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $347 | $519 | Implemented |
WV0205 # 02 Y:2000 | 02 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,709 | $800 | Not Implemented |
WV0205 # 01 Y:2000 | 01 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,419 | $800 | Not Implemented |
WV0205 # 11 Y:2000 | 11 | 2000 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $480 | $100 | Implemented |
WV0205 # 12 Y:2000 | 12 | 2000 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $80 | $0 | Implemented |
WV0205 # 15 Y:2000 | 15 | 2000 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $35,000 | $5,000 | Not Implemented |
WV0205 # 14 Y:2000 | 14 | 2000 | INSTALL EQUIPMENT TO MOVE PRODUCT | $77,688 | $750 | Not Implemented |
TN0696 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $68,153 | $6,800 | Implemented |
TN0696 # 01 Y:2000 | 01 | 2000 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $184,000 | $44,000 | Implemented |
TN0696 # 02 Y:2000 | 02 | 2000 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $182,800 | $173,400 | Not Implemented |
TN0696 # 06 Y:2000 | 06 | 2000 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $35,400 | $18,900 | Implemented |
TN0696 # 08 Y:2000 | 08 | 2000 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $33,720 | $5,075 | Implemented |
TN0696 # 03 Y:2000 | 03 | 2000 | MODIFY CURRENT INCENTIVE PROGRAM | $78,500 | $16,450 | Not Implemented |
TN0696 # 05 Y:2000 | 05 | 2000 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $50,500 | $0 | Not Implemented |
TN0696 # 07 Y:2000 | 07 | 2000 | ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS | $31,500 | $0 | Not Implemented |
IA0249 # 06 Y:2000 | 06 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,039 | $2,715 | Not Implemented |
IA0249 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,737 | $5,177 | Not Implemented |