Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
765
matching recommendationsSIC | 3411 | Metal Cans |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0188 # 06 Y:2000 | 06 | 2000 | USE ALTERNATIVE FLOCCULENT TO MINIMIZE SLUDGE VOLUME | $42,287 | $34,300 | Not Implemented |
OD0130 # 01 Y:1999 | 01 | 1999 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $378 | $140 | Implemented |
OD0130 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,622 | $3,864 | Not Implemented |
OD0130 # 03 Y:1999 | 03 | 1999 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $3,818 | $2,580 | Not Implemented |
OD0130 # 04 Y:1999 | 04 | 1999 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $54,000 | $1,600 | Not Implemented |
AS0232 # 01 Y:1998 | 01 | 1998 | INSTALL OCCUPANCY SENSORS | $528 | $750 | Not Implemented |
AS0232 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,829 | $20,012 | Implemented |
AS0232 # 03 Y:1998 | 03 | 1998 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $141,064 | $100,000 | Not Implemented |
AS0232 # 04 Y:1998 | 04 | 1998 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,577 | $785 | Implemented |
AS0232 # 05 Y:1998 | 05 | 1998 | UPGRADE CONVEYORS | $3,611 | $10,240 | Not Implemented |
AS0232 # 06 Y:1998 | 06 | 1998 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $14,269 | $9,500 | Not Implemented |
AS0232 # 07 Y:1998 | 07 | 1998 | CLEAR AND RENT EXISTING SPACE | $27,050 | $3,600 | Not Implemented |
AS0232 # 08 Y:1998 | 08 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $300,000 | $80,000 | Not Implemented |
AS0232 # 09 Y:1998 | 09 | 1998 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $19,710 | $46,000 | Not Implemented |
BD0118 # 01 Y:1998 | 01 | 1998 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $32,188 | $123,000 | Implemented |
BD0118 # 02 Y:1998 | 02 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,395 | $1,500 | Not Implemented |
BD0118 # 03 Y:1998 | 03 | 1998 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $2,711 | $2,400 | Not Implemented |
BD0118 # 04 Y:1998 | 04 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,529 | $3,580 | Not Implemented |
BD0118 # 05 Y:1998 | 05 | 1998 | INSTALL OCCUPANCY SENSORS | $1,186 | $700 | Implemented |
BD0118 # 06 Y:1998 | 06 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $957 | $800 | Implemented |
BD0118 # 07 Y:1998 | 07 | 1998 | REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE | $880 | $750 | Not Implemented |
BD0118 # 08 Y:1998 | 08 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $774 | $350 | Implemented |
BD0118 # 09 Y:1998 | 09 | 1998 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $755 | $300 | Not Implemented |
BD0118 # 10 Y:1998 | 10 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $501 | $0 | Implemented |
BD0118 # 11 Y:1998 | 11 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $448 | $450 | Implemented |