IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

87

matching recommendations
Reset
SIC 342 Cutlery, Handtools, And Hardware
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0272 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $521 $1,231 Not Implemented
SF0272 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $542 $0 Implemented
SF0272 # 03 Y:2003 03 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,425 $190 Not Implemented
SF0272 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,205 $0 Implemented
LM0044 # 02 Y:2002 02 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,530 $3,825 Not Implemented
LM0044 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,025 $625 Implemented
LM0044 # 04 Y:2002 04 2002 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $14,885 $0 Implemented
LM0044 # 03 Y:2002 03 2002 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $5,678 $2,120 Not Implemented
LM0044 # 05 Y:2002 05 2002 PURCHASE APPROPRIATELY SIZED MATERIAL $216,000 $3,400 Implemented
LM0044 # 06 Y:2002 06 2002 DEVELOP STANDARD OPERATING PROCEDURES $159,315 $6,792 Not Implemented
LM0044 # 07 Y:2002 07 2002 MODIFY STARTUP/SHUTDOWN TIMES $5,695 $300 Not Implemented
LM0004 # 07 Y:2001 07 2001 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $44,800 $1,000 Implemented
LM0004 # 01 Y:2001 01 2001 INSTALL SKYLIGHTS $8,789 $8,500 Not Implemented
LM0004 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,547 $725 Implemented
LM0004 # 03 Y:2001 03 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $910 $1,530 Not Implemented
LM0004 # 04 Y:2001 04 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $8,492 $1,950 Not Implemented
LM0004 # 05 Y:2001 05 2001 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $3,420 $1,000 Not Implemented
LM0004 # 06 Y:2001 06 2001 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $666 $1,000 Implemented
LM0004 # 08 Y:2001 08 2001 CLEAR AND RENT EXISTING SPACE $240,000 $25,000 Not Implemented
SF0210 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $869 $2,640 Implemented
SF0210 # 01 Y:2001 01 2001 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $11,594 $14,640 Not Implemented
SF0210 # 02 Y:2001 02 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,719 $4,350 Implemented
SF0210 # 07 Y:2001 07 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,801 $15,374 Not Implemented
SF0210 # 06 Y:2001 06 2001 SELL USED PLATES TO AN ALUMINUM RECYCLER $3,400 $70 Implemented
SF0210 # 05 Y:2001 05 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,580 $40 Not Implemented