IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

82

matching recommendations
Reset
SIC 342 Cutlery, Handtools, And Hardware
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0673 # 07 Y:2011 07 2011 INSTALL OCCUPANCY SENSORS $743 $1,800 Not Implemented
MA0673 # 01 Y:2011 01 2011 INSULATE BARE EQUIPMENT $4,145 $1,370 Implemented
MA0673 # 08 Y:2011 08 2011 INSULATE BARE EQUIPMENT $386 $450 Not Implemented
MA0673 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,772 $540 Implemented
MA0530 # 09 Y:2003 09 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,271 $2,750 Implemented
MA0530 # 10 Y:2003 10 2003 PAY BILLS ON TIME TO AVOID LATE FEES $692 $1,275 Implemented
MA0530 # 06 Y:2003 06 2003 RECOVER WASTE HEAT FROM EQUIPMENT $8,396 $9,900 Not Implemented
MA0530 # 08 Y:2003 08 2003 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $8,213 $26,700 Not Implemented
MA0530 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,661 $400 Implemented
MA0530 # 02 Y:2003 02 2003 IMPROVE SPACE COMFORT CONDITIONING $56,030 $207,000 n/a
MA0530 # 03 Y:2003 03 2003 CLEAR AND RENT EXISTING SPACE $83,099 $162,400 Not Implemented
MA0530 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,234 $30,400 n/a
MA0530 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,046 $9,100 Not Implemented
MA0530 # 01 Y:2003 01 2003 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $233,841 $25,050 n/a
MA0483 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,650 $800 Implemented
MA0483 # 06 Y:2001 06 2001 USE RADIANT HEATER FOR SPOT HEATING $1,050 $6,000 Not Implemented
MA0483 # 07 Y:2001 07 2001 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $570 $2,500 Implemented
MA0483 # 04 Y:2001 04 2001 INSULATE BARE EQUIPMENT $2,250 $12,000 Not Implemented
MA0483 # 03 Y:2001 03 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,200 $11,000 Not Implemented
MA0483 # 02 Y:2001 02 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,400 $14,000 Not Implemented
MA0483 # 01 Y:2001 01 2001 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $8,700 $0 Implemented
MA0474 # 04 Y:2000 04 2000 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $746 $4,000 Not Implemented
MA0474 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,827 $1,000 Implemented
MA0474 # 06 Y:2000 06 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $371 $100 Implemented
MA0474 # 03 Y:2000 03 2000 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $2,838 $13,000 Not Implemented