IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,203

matching recommendations
Reset
SIC 342 Cutlery, Handtools, And Hardware
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0514 # 04 Y:1993 04 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,600 $10,000 Not Implemented
GT0514 # 05 Y:1993 05 1993 OPTIMIZE PLANT POWER FACTOR $16,240 $25,000 Implemented
GT0514 # 06 Y:1993 06 1993 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $13,150 $40,000 Not Implemented
GT0514 # 07 Y:1993 07 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,860 $17,100 Not Implemented
UD0398 # 01 Y:1993 01 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,277 $0 Not Implemented
UD0398 # 02 Y:1993 02 1993 REDUCE FLUID FLOW RATES $7,396 $5,000 Implemented
UD0398 # 03 Y:1993 03 1993 RECOVER WASTE HEAT FROM EQUIPMENT $12,240 $40,000 Not Implemented
UD0398 # 04 Y:1993 04 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $156 $200 Implemented
UD0398 # 05 Y:1993 05 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,539 $0 Not Implemented
UD0398 # 06 Y:1993 06 1993 UPGRADE CONTROLS ON COMPRESSORS $5,166 $800 Implemented
UF0060 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,244 $46,210 Not Implemented
UF0060 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $719 $2,833 Not Implemented
UF0060 # 03 Y:1993 03 1993 INSTALL SPECTRAL REFLECTORS / DELAMP $11,130 $11,140 Not Implemented
UF0060 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $281 $238 Not Implemented
UF0060 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,981 $9,710 Not Implemented
UF0060 # 06 Y:1993 06 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,268 $2,250 Not Implemented
UF0060 # 07 Y:1993 07 1993 OPTIMIZE PLANT POWER FACTOR $8,898 $13,975 Not Implemented
UF0060 # 08 Y:1993 08 1993 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,618 $3,700 Not Implemented
WI0155 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $395 $5 Not Implemented
WI0155 # 02 Y:1992 02 1992 INSTALL SET-BACK TIMERS $370 $400 Not Implemented
WI0155 # 03 Y:1992 03 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,747 $500 Implemented
WI0155 # 04 Y:1992 04 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,583 $2,800 Not Implemented
WI0155 # 05 Y:1992 05 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,483 $0 Not Implemented
WI0155 # 06 Y:1992 06 1992 RECOVER WASTE HEAT FROM EQUIPMENT $844 $2,000 Not Implemented
WI0155 # 07 Y:1992 07 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $381 $1,280 Not Implemented